
Page 9 of 23
Manual_ECC_PRESS_AIR_Release 1.5.docx / 13.06.2017
vii)
Put the glass fibre separator into the sleeve and dispense a defined amount of
electrolyte onto it. The optimum amount of electrolyte depends on the
electrodes and separator used, and has to be carefully determined in pre-
tests. 0.5 cm
3
are a reasonable amount for 1.5 mm thick glass fiber separator.
viii)
Put the lithium CE disc (18 mm diameter, approx. 0.2 mm thick) on top of the
cell stack.
ix)
Push the cell base over the assembly, hold the components tightly together,
and turn the assembly back into the upright position.
x)
Release the pressure applied on the cell stack, mount the locking ring to align
the side opening of the cell base with the feed-through hole of the REF sleeve,
and replace the plug in the cell base by the spring-loaded REF pin.
xi)
Insert the PE seal and the spring.
xii)
Attach the cell lid with the siphon and tube already attached
xiii)
Push the cell into the bracket, and tighten the wing nut.