
Page 7 of 23
Manual_ECC_PRESS_AIR_Release 1.5.docx / 13.06.2017
3 Safety Precautions
Use proper safety precautions when using hazardous electrode materials and
electrolytes. Wear protective glasses and gloves to protect you against electrolyte
that may accidentally spill out during filling and disassembly. Upon cell disassembly,
dispose all materials properly. Metallic lithium and some insertion compounds may
decompose heavily in contact with water and other solvents, and can cause fire.
4 Unpacking
Check the contents of the packages against the list given below to verify that you
have received all of the components. Contact the factory if anything is missing or
damaged.
NOTE
: Damaged shipments must remain with the original packaging for
freight company inspection.
List of Components
1.
ECC-Press-Air test cell with pressure sensor, assembled for use in a
2-electrode dead-end pressurized set-up
2.
Gas sample port with septum and valve
3.
Reference electrode pin, REF sleeve and locking pin for 3-electrode
operation
4.
PE seals (10 pieces)
5.
Septum (10 pieces)
6.
One-way syringe and needle
7.
Glass fiber separators 18 mm x 1.55 mm (10 pieces)
8.
Sleeve removal tool
9.
24 V power supply with country specific adapters
10. Controller box with analog outputs for pressure and temperature, 4 mm
banana sockets for connection to an external potentiostat, and integrated
USB data logger (DL option)
11. CD with manual and data logger software (DL option)
12. USB cable (DL option)
13. Cell cable for connection between test cell and controller box