INSTALLATION
10/2022
33
NP-DK50 2V-A-4_10-2022-AD
Connect the cabinet pressure gauge to the compressor per Chapter 11.2.
Connect the display in the front door of the cabinet (Fig. 15), and secure the cord to the
display in the clamps (Fig. 16).
Fig. 15: Connecting the display connector
Fig. 16: Position of the clamps in the cabinet
14. COMMISSIONING
Check if all fixing elements used during transport have been removed.
Check correct connection of compressed air (see chapter 11).
Check correct connection to the mains (see chapter 12)
Check position of the circuit breaker switch,
it must be in position „I“. If it is in position „0“,
turn the switch (2
) to position „I“ (Fig. 17)
On compressor in the cabinet, switch the switch (5) on the front side of the cabinet to position
„I“, the green light indicates the device status in operation. (Fig. 17).
Check connection of the cabinet manometer hose to the pneumatic block of the compressor.
Summary of Contents for DK50 2V/M MOBILE
Page 1: ...N VOD NA POU ITIE SK USER MANUAL EN N VOD K POU IT CS BENUTZERHANDBUCH DE...
Page 2: ......
Page 4: ...CONTENTS 5 INHALT 62 OBSAH 120 OBSAH 176...
Page 15: ...PRODUCT DESCRIPTION 10 2022 15 NP DK50 2V A 4_10 2022 AD Fig 3 Cabinet...
Page 72: ...PRODUKTBESCHREIBUNG NP DK50 2V A 4_10 2022 AD 72 10 2022 Abb 3 Geh use...
Page 83: ...INSTALLATION 10 2022 83 NP DK50 2V A 4_10 2022 AD A B C...
Page 130: ...POPIS V ROBKU NP DK50 2V A 4_10 2022 AD 130 10 2022 Obr 3 Skrinka...
Page 142: ...IN TAL CIA NP DK50 2V A 4_10 2022 AD 142 10 2022 Obr 6 Pripojenie tlakovej hadice...
Page 186: ...POPIS V ROBKU NP DK50 2V A 4_10 2022 AD 186 10 2022 Obr 3 Sk ka...
Page 198: ...INSTALACE NP DK50 2V A 4_10 2022 AD 198 10 2022 Obr 6 P ipojen tlakov hadice...
Page 236: ......
Page 237: ......
Page 238: ......
Page 239: ......