19
Maintenance periods listed in this manual apply to single shift a day under
normal operation conditions. If using in dusty environment, the ambient
temperature varies remarkably or in multi-shift situation, the maintenance
period has to be shortened.
Maintain the stacker according to following maintenance list. Maintenance
periods are as follows:
W1 = Every 50 work hours, but at least once a week.
M3 = Every 500 work hours, but at least once every three months
M6 = Every 1000 work hours, but at least once every six months
M12 = Every 2000 work hours, but at least once every 12 months
Additional operations should be performed in trial run period:
(In initial 50
–
100 working hours or after two months)
—
Check the nuts on the wheels, and tighten them if necessary.
—
Check the hydraulic components for leakage, and tighten them if
necessary.
—
Replace the hydraulic filter.