6
Under the condition of normal working of charging function, the density of 1.26±0.005(25
℃
) tem perature
below 30
℃ sulfuric acid electrolyte into the battery, liquid level requirem ents higher th
an the protection
plate 0.6 ~ 1.0 in.
Leave the battery to rest for 3-4 hours, no more than 8 hours
.
Initial charging can be carried out only
when the liquid temperature drops below 35
℃.If the electrolyte level drops after standing, the electrolyte
should be replenished.
The discarded batteries must be recovered and stored in the specified environmental protection area or
the specified waste disposal area in accordance with the local laws and regulations, and the work must
be carried out by qualified professional companies.
d. Check fuse
List 2:
Fuse specification
specification
Fuse 1
10A
Fuse 01
300A
200Afuse
Summary of Contents for EK07S Series
Page 1: ...SERVICE MANUAL EK07S Series Counter Balanced Stacker...
Page 16: ...14 Using an inner hexagon wrench adjust the pressure...
Page 17: ...15 a Schematic diagram and wiring diagram EK05S Electrical Schematic diagram...
Page 18: ...EK07S Electrical Schematic diagram...
Page 19: ...B Hydraulic circuit Hydraulic circuit...
Page 22: ...20 B Removal of electric control component...
Page 23: ...21 B Removal of electric control component No Code name Specificatio n qua nti ty rem ark...
Page 25: ...23 c Hydraulic assembly removal 1 GB T 41 2000 Hexagonal nut M6 5...
Page 27: ...25...
Page 28: ...26 No Code Name Specification Quant ity Remark...
Page 31: ...29 NO Code Name Specificat ion Quanti ty Remark...