
ER15-4-1600 Quick Operation Manual for Industrial Robot
第
26
页
1) End flange mounting interface
Figure 2-8 Dimension drawing of end load mounting flange
2) Other auxiliary interfaces
Figure 2-9 Dimension drawing of external parts installed on the boom Figure 2-10 Dimension drawing of external parts installed on the
forearm
Figure 2-11 Dimensions of the external parts installed on the wrist body