Withstand Processing
When a Ground Bond is integrated with a 7100 series as a test system, the
processing signal from the Hipot tester will be sent across pin (6) and pin (7) of the
Ground Bond Tester Remote Signal Input. This signal will activate the front panel
“Withstand Processing” indicator that notifies the operator that high voltage is enabled.
If the Hipot start is set to G
W (sequential) then the “Withstand Processing” indicator
will appear as the following pop-up message:
If the Hipot start signal is set to G+W then a small “W-T” indicator will appear in the
upper right of the display.
PLC Remote Pop-up message
If you attempt to start a test from the front panel TEST button and the PLC remote
function is turned “ON”, a pop-up message will be displayed.
Ground Bond Tester Connected to HIPOT Tester
The following illustration and should be used to configure the ESD-140 for integrated
operation with 7142:
When HIPOT Tester is connected to Ground Bond Tester, the HIPOT Tester should
have PLC remote turned on. In this configuration, you will only be able to start and
reset the Ground Bond Tester from the Ground Bond Tester. It is possible to reset or
abort the HIPOT Tester from both instruments.
Gray
1217
White
1218
Signal Output
Signal Input
Signal Input
Signal Output