Figure 2 Turbomolecular pump start delay with XDD1 diaphragm pump
Connect a vacuum gauge
A single compatible active gauge can be fitted to the T-Station 85.
Fit the gauge using an Edwards active gauge cable into the gauge connector located on the side
of the controller housing (refer to
Figure 1
on page 10, item
6
). For active gauge control and set
up refer to
Gauge screen
on page 19.
The following Edwards active gauges are suitable for use with the T-Station 85:
•
APG100 Active Pirani vacuum gauge
•
APGX-H Active Linear Convection gauge
•
AIM-X Active Inverted Magnetron gauge
•
ASG Active Strain gauge
Commission the installation
After installing the T-Station 85, the system must be tested.
Use the following procedure to test the system:
1. Make sure that all the electrical connections are secure.
2. Switch on the electrical supply and the exhaust extraction system (if available).
3. To operate the system press the START/STOP key. Check that the equipment operates
as described in .
4. Check that the turbo pump reaches normal speed. If the pump inlet is valved or
capped off, it should take approximately 100 - 150 seconds for the turbo to reach
normal speed. If a vacuum chamber is attached to the pump inlet, this time may take
longer.
5. To turn OFF the system, press the START/STOP key followed by the ENTER key to
confirm. Check that the equipment closes down as described in .
For full operational details and how to navigate using the front panel control key pad refer to
Menu structure
on page 17.
D395-94-880A - Installation
Page 15