MAINTENANCE
SEAS ONAL MAINTE NANCE
(implemented by the DEALER )
Consists in:
• Clean the boiler-stove internally and externally
• Carefully clean the heat exchange tubes
• Carefully clean and remove dirt from the combustion chamber
and the relative compartment
• Clean fans, verify mechanical and clamp loosening
• Clean smoke channel (replace seals on smoke exhaust pipe)
• Clean smoke duct
• Check the expansion tank
• Clean/check the Synoptic Panel
• Clean smoke extraction fan compartment.
• Clean smoke check thermocouple.
• Empty the pellet hopper and clean the base with the vacuum
cleaner.
• Clean, inspect and scrape any residue from the ignition resistan-
ce compartment and if necessary, replace it
• Visually inspect the electrical wires, connections and power cable
• Check play of the screw-gear motor group
• Clean the pellet hopper and check loosening of the feed screw -
gear motor assembly
• Replace the door seal
• Functionality test: load the feed screw, ignite, let it run for 10
minutes and shutdown
If the boiler-stove is used very frequently, it is advisable to
clean the smoke channel and the fume duct every 3 months.
ATTENTION !!!
After implementing a normal cleaning procedure, INCOR-
RECT coupling of the upper (A) (fi gura C) and lower
(B) (fi gura C) combustion chambers can compromise the
stove’s performance. Before igniting the stove, make sure
the combustion chambers are correctly paired as indicated
in (fi g. D) without ash or unburnt material present on the
support perimeter.
We remind you that using the stove without cleaning the mel-
ting pot, may cause a sudden ignition gas inside the combu-
stion chamber with the consequent breaking of the glass
CLEANING THE SMOKE DUCT
• With the boiler stove off and cooled down, apply force to move
the cleaning rod (see previous page); remove the interlocking
sheet metal lower front panel (4 - Fig. E).
• Remove the sheet metal inspection panel (5 - Fig. E) together
with the silicone gasket (6 - Fig. E) secured with wing nuts; clean
the silicone gasket and aspirate the residues in the fume conduit
(7 - Fig. E).
The thermo stove comes with a spare silicone gasket.
The quantity of residue which forms depends on the type of fuel
and the type of system.
If cleaning is not carried out, the boiler-stove may not function
properly.
Note: after the operation, make sure that the smoke duct
inspection closure is correctly repositioned.
fi g. D
fi g. E
4
fi g. C
B
A
7
6
5
Summary of Contents for MITO IDRO
Page 10: ... 10 ITALIANO INFORMAZIONI GENERALI ...
Page 39: ... 39 ENGLISH GENERAL INFORMATION ...
Page 68: ... 68 FRANÇAIS INFORMATIONS GÉNÉRALES ...
Page 126: ... 126 126 DEUTSCH ALLGEMEINE INFORMATIONEN ...
Page 184: ... 184 DANSK 184 GENERELLE OPLYSNINGER ...
Page 263: ......
Page 293: ......
Page 352: ... 352 cod 941204 12 16 H w w w e d i l k a m i n c o m ...