
EGT probe to the Juice Module
1. Slide the shrink tube pieces over the two wires. Later you will
slide them over the bolted connections.
2. Connect the (2) ring terminals
to the mating Juice harness terminals
using the supplied hardware.
Yellow to Yellow. Red to Red.
3. Tighten the nuts so that each wire is in line with its mating wire.
4. Position the supplied shrink tube over the secure fasteners.
5. Center the connection within the shrink tube. Heat and shrink
the tubing over the connections.
6. Secure the excess cable to the existing engine wire harnesses
with supplied zip ties.
Ring Terminals
Shrink Tube
Nut
Bolt
Summary of Contents for Juice Attitude
Page 1: ...ty...
Page 24: ...MAP Sensor PCM Suggested Juice Module Locations 2003 2007...