
C
HAPTER
2
| Installing the Switch
Equipment Checklist
– 33 –
E
QUIPMENT
C
HECKLIST
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
P
ACKAGE
C
ONTENTS
◆
Gigabit Ethernet Switch (ECS4810-12M)
◆
Four adhesive foot pads
◆
Power Cord
◆
Bracket Mounting Kit containing two brackets and eight screws for attaching
the brackets to the switch
◆
Console cable (RJ-45 to DB-9)
◆
This Installation Guide
◆
Management Guide CD
O
PTIONAL
R
ACK
-M
OUNTING
E
QUIPMENT
◆
If you plan to rack-mount the switches, be sure to have the following
equipmentavailable:
◆
Four mounting screws for each device you plan to install in a rack—these
are not included
◆
A screwdriver (Phillips or flathead, depending on the type of screws used)
Summary of Contents for ECS4810-12M
Page 1: ...Installation Guide www edge core com 12 Port Gigabit Ethernet Switch ECS4810 12M ...
Page 2: ......
Page 4: ......
Page 14: ...COMPLIANCES AND SAFETY STATEMENTS 14 ...
Page 20: ...TABLES 20 ...
Page 22: ...FIGURES 22 ...
Page 44: ...CHAPTER 2 Installing the Switch Connecting to the Alarm Port 44 ...
Page 52: ...CHAPTER 3 Making Network Connections Cable Labeling and Connection Records 52 ...
Page 56: ...APPENDIX A Troubleshooting In Band Access 56 ...
Page 72: ...GLOSSARY 72 ...
Page 75: ......