15
Installing Boiler Jacket Panels - Continued
7.
Attach upper jacket end panel (right) so left edge hangs
on bracket on top/front intermediate panel. Insert bare
metal plate in same manner as left panel. Figure 20.
8.
Attach middle jacket end panel (right) to upper jacket
end panel with middle laying over upper and lining up
holes. Use (6) #10 x ½” screws. Figure 21.
9.
Attach lower jacket end panel (right) to middle jacket
end panel with lower behind middle and lining up holes.
Use (5) #10 x ½” screws. Attach lower jacket end
panel to two Z-bars on base end closures through two
slotted holes on bottom of jacket end panel. Use (2)
#10 x ½” screws. Figure 21B.
10.
Position top of rear jacket panel(s) to draft hood baffl e
fl ange and secure with (2) #10 x ½” screws. Secure
bottom of rear jacket panel(s) to bracket(s) on boiler
base using (2) #10 x ½” screws. Figure 22.
Installing Boiler Jacket Panels - Continued
INSTALLATION – ASSEMBLY
Figure 19
Figure 18
Figure 21A
Figure 20