72
1.4 Sequence of Operation
Operational State
User Interface Display
Explanation
Boiler operates in standby mode until
demand for Central Heat (CH) or
Domestic Hot Water (DHW) is detected.
CH or DHW pump is turned on based on
type of heating demand.
(CH call is illustrated)
Control Module compares supply
temperature to set point. Boiler proceeds
to ignition if supply temperature is less
than set point.
Combustion Air Blower speed
modulates to pre-purge setting for 15
seconds.
Sparking initiated sequence.
S t a n d b y : N o D e m a n d
Heat
Demand?
DHW CH
Pump on
Supply
Temperature
<Setpoint?
15 Second
Prepurge
Ignition
Sparking
No
Yes
No
Yes
After 2 seconds
APPENDIX A - CONTROL MODULE
P/N# 240008888, Rev. O [07/15/2015]
Summary of Contents for Dunkirk Helix DKVLT-050
Page 48: ...48 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...
Page 52: ...52 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...
Page 54: ...54 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...
Page 67: ...67 14 WIRING DIAGRAM 14 3 Connection Diagram 150 200 299 MBH P N 240008888 Rev O 07 15 2015...