46
•
Remove ¼-20 hex flange nuts securing condensate
collector to heat exchanger using 7/16" deep well
socket. See figures 11-3 & 11-4.
• Remove condensate collector assembly from heat
exchanger and flue pipe.
• Flush collector and condensate trap with water.
• Follow Burner Inspection Kit instructions to reassemble
boiler and resume operation.
11 - GENERAL MAINTENANCE AND CLEANING
P/N# 240008888, Rev. O [07/15/2015]
Summary of Contents for Dunkirk Helix DKVLT-050
Page 48: ...48 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...
Page 52: ...52 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...
Page 54: ...54 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...
Page 67: ...67 14 WIRING DIAGRAM 14 3 Connection Diagram 150 200 299 MBH P N 240008888 Rev O 07 15 2015...