EcoFoot5D Install Guide V1.1-FINAL
Page 9 of 19
January 25, 2018, ES10560
ecolibriumsolar.com
Step 3 – Secure PV Modules onto Bases
3.1
Place PV module onto EcoFoot5D Base.
3.2
Space modules ½” apart using alignment marks located on the Clamps
3.3
Torque Nuts to 14 ft-lbs using a 1/2" deep socket.
Nuts
(F) to
Warnings
Step 4 – Install Mid-Support.
4.1
Locate module center point +/-1” using PV module cell lines.
4.2
Press the Upper and Lower Mid-Supports onto the module frame.
Note: On the south row, the Upper Mid-Support will not be pressed onto a module frame.
On the north row, the Lower Mid-Support will not be pressed onto a module frame.
4.3
Slide Upper and Lower Mid-Support together using the male/female features.
If required, place optional, self-adhering EPDM pads on the bottom surface of the Upper and Lower
Mid-Supports.
Nut
Base
Module
Nut
PV Module
Center Point
Upper &
Lower
Mid-Support
Press Upper
Mid-Support
on to Frame
Press Lower
Mid-Support on to
Frame
Slide together
Upper & Lower
Mid-Support
Installation Tips
After Step 3, wiring can
be routed and secured.
Standard wire clips or
cable ties (not included)
can be inserted into slots
along Base edge.