Appendix B: Roof Attachment Methods 

EcoFoot5D can be attached when required by seismic and uplift conditions or the Authority Having Jurisdiction 
(AHJ). There are 3 methods of attachment that satisfy seismic and uplift requirements for Type 1 and Type 2 
modules. Use the method indicated for the specific Fire Code Rating of the PV module. The Ballast Tray is not 
required for attachment method for Modules with a Type 1 Fire Code Rating. The Ballast Tray is required for 
attachment method for Modules with a Type 2 Fire Code Rating.  
 

Attachment Methods

 

Seismic and Uplift Attachment 

Seismic Attachment 

Modules with Type 1 Fire Code Rating 

Use Attachment with Strut 

Modules with Type 1 & 2 Fire Code Rating 

Use Attachment with Ballast Tray  
 

Modules with Type 1 & 2 Fire Code Rating 

Use Attachment with Ballast Tray and Strut  

 

Attachment with Strut  

Attachment with Strut – Components included in Kit  

1

 

L-Bracket, 2”x3” – 

Qty 3

 

 

 

2

   Elevator Bolt, 1/4"-20 x 1-1/2” 

     

Qty 2 

2

 

Nut, Serrated Flange 1/4"-20 

Qty 2 

4

   Nut, Strut 3/8"-16 x 1” 

Qty 3

 

3

 

Nut, Serrated Flange 3/8"-16 

Qty 1 

  Bolt, Serrated Flange 3/8"-16 

Qty 3

 

 

 
 

Components Not Included in Kit 

Strut, 1-5/8” x 1-5/8” 

 

  Roof Attachment (Flat Plate or 

Station Anchor)  

 

 

 

Tools Required 

7/16” Deep Socket 
9/16” Deep Socket 
9/16” Open-End Wrench 
Calibrated Torque Wrench 

Torque Settings 

8 ft-lbs for 1/4" fasteners, 14 ft-lbs. for 3/8” fasteners 

 

Summary of Contents for EcoFoot5D

Page 1: ...riumSolar com Field Support 866 488 6794 FieldSupport EcolibriumSolar com www ecolibriumsolar com Installation Guide Installation Guide EcoFoot5D High Density 5 Degree Ballasted Racking System Document No ES10560 Rev 1 1 January 2018 ...

Page 2: ...ide V1 1 FINAL Page 2 of 19 January 25 2018 ES10560 ecolibriumsolar com Revision History Revision Description of Changes Date 1 0 Initial EcoFoot5DTM Release 2017 September 05 1 1 Add Attachment Appendix B 2018 January 25 ...

Page 3: ...sibility 4 Disclaimer of Liability 4 Warnings Safety 5 EcoFoot5D General Application Notes 5 EcoFoot5D Core Components 7 Install EcoFoot5D in 6 Simple Steps 8 Appendix A Grounding Bonding 11 Appendix B Roof Attachment Methods 12 Legal Notices 2017 Ecolibrium Solar Inc Ecolibrium Solar and EcoFoot2 are registered trademarks of Ecolibrium Solar Inc EcoFoot5D is a trademark of Ecolibrium Solar Inc re...

Page 4: ...ty equipment as required by applicable rules and regulations Complying with all applicable local and national building codes including any that may supersede this manual Ensuring that Ecolibrium Solar EcoFoot5DTM and other products are appropriate for the specific installation and are designed for the installation environment Ensuring that the roof its rafters connections and other structural supp...

Page 5: ...hen working with or near electrical systems Always provide OSHA approved fall protection for all installation personnel Never wear jewelry during mechanical and electrical installation work Never work in rain snow or extremely windy conditions Never leave a module unsupported or unsecured on the roof Never install broken photovoltaic modules EcoFoot5D General Application Notes Site Specific System...

Page 6: ...e to be immediately replaced Compatible Modules Ecolibrium Solar has evaluated many photovoltaic modules for installation compatibility with the EcoFoot5D ballasted racking system A list of compatible modules may be found in EcoFoot5D Install Guide Appendix Compatible Modules pdf on our website www ecolibriumsolar com UL2703 Qualification In cases where UL 2703 certification is required the EcoFoo...

Page 7: ...coFoot5D Base 2 Universal Clamp Lower 3 Universal Clamp Upper 4 Clevis Pins 5 Wind Deflector 6 Ballast Tray 7 Mid Support Upper 8 Mid Support Lower 9 5 16 Thread Forming Screw Hardware Required All required hardware is included Tools Required Deep Socket Calibrated Torque Wrench Torque Settings 14 ft lbs on all Fasteners ...

Page 8: ...ocker Step 2 Position Array 2 1 Snap two chalk lines on roof denoting outside edges of the EcoFoot5D Bases per project drawing Start from the north or south edge Ensure chalk lines are square 2 2 Place EcoFoot5D Bases in approximate position throughout the array Installation Tips Only install Clamps where modules will rest See Step 3 for correct placement and orientation of Clamps Base Lower Clamp...

Page 9: ...e south row the Upper Mid Support will not be pressed onto a module frame On the north row the Lower Mid Support will not be pressed onto a module frame 4 3 Slide Upper and Lower Mid Support together using the male female features If required place optional self adhering EPDM pads on the bottom surface of the Upper and Lower Mid Supports Nut Base Module Nut PV Module Center Point Upper Lower Mid S...

Page 10: ...Kit Torque Screw to 14 ft lbs 5 3 Place ballast not included in a single layer evenly dispersed along the length of Ballast Trays Apply ballast per the ballast plan specified in the PE Certified Ballast Plan Sheet S 1 0 Step 6 Install Wind Deflector 6 1 Place Wind Deflectors into slot on EcoFoot5D Base and attach to Rocker using Nut provided 6 2 Torque Nut to 14 ft lbs using a deep socket Applicat...

Page 11: ...d Deflector a minimum of from any edge One Ground Lug is required for every 400 modules connected within an array Ecolibrium Solar recommends using 6 copper ground wire in conjunction with WEEB grounding devices such as the WEEB LUG 6 7 or WEEB DSK516 Lugs are a single use component Other grounding methods must be reviewed and approved by a licensed master electrician or electrical engineer and Au...

Page 12: ...ing Attachment Methods Seismic and Uplift Attachment Seismic Attachment Modules with Type 1 Fire Code Rating Use Attachment with Strut Modules with Type 1 2 Fire Code Rating Use Attachment with Ballast Tray Modules with Type 1 2 Fire Code Rating Use Attachment with Ballast Tray and Strut Attachment with Strut Attachment with Strut Components included in Kit 1 L Bracket 2 x3 Qty 3 2 Elevator Bolt 1...

Page 13: ...d Flange Nut 1 2 Roof Attachment Place L Bracket on Stud and secure with 3 8 16 Serrated Flange Nut Step 2 Install Flat Plate or Station Anchor Roof Attachment 2 1 Align L Bracket of Roof Attachment with L Brackets on Bases and install Roof Attachment on either side of the Mid Support Install Roof Attachment per Roof Attachment manufacturer s instructions Elevator Bolt L Bracket Flange Nut Line be...

Page 14: ...ep 3 Attach Strut to L Brackets and Tighten Hardware 3 1 Secure Strut to L Brackets with 3 8 16 Serrated Hex Bolt and 3 8 16 Strut Nut Engage grooves of Strut Nut with the two lips within Strut 3 2 Tighten and torque all hardware Torque 20 hardware to 8 ft lbs Torque 3 8 16 hardware to 14 ft lbs ...

Page 15: ...4 Bolt Serrated Flange 1 4 20 Qty 4 5 Nut Serrated Flange 3 8 16 Qty 2 Not Included in Kit Roof Attachment Flat Plate Optional Addition of Strut to Ballast Tray Components Included in Kit 1 Screw Sheet Metal 12 x Qty 6 2 Washer Fender ID x 1 OD Qty 6 Not Included in Kit Strut 1 5 8 x 1 5 8 Torque Settings 8 ft lbs for 1 4 fasteners 14 ft lbs for 3 8 fasteners 5 ft lbs for sheet metal screws Tools ...

Page 16: ...t Tray install Roof Attachment per manufacturer s instructions Note Position the attachment such that it can share the same slot with the Mid Support as shown Step 2 Install Mid Span Support 2 1 Refer to Step 4 of the Installation Guide to install Mid Span Support Step 3 Install Hardware on Attachment Stud 3 1 Install 3 8 16 Serrated Flange Nut and 7 16 ID x 1 OD Washer onto Roof Attachment stud L...

Page 17: ...ay Line up slots with attachment stud base hardware and Mid Support 5 2 Torque fastener into Mid Span Support to 14 ft lbs through slot on Ballast Tray 5 3 Fasten Ballast Tray to base with Washers and Serrated Hex Bolts on both bases Torque to 8 ft lb 5 4 Install Washer and Serrated Flange Nut onto Preferred Roof Attachment in order shown below Torque Serrated Flange Nut to 14 ft lbs 5 5 Roof Atta...

Page 18: ...length of Ballast Trays centering Strut over Roof Attachment 6 2 Install two Sheet Metal Screws and Fender Washers on either side and as close to the roof attachment stud as possible Install additional screws along the length of the strut at no more than 24 intervals Strut reinforcement attachment complete Sheet Metal Screws with Fender Washers installed along the length of the strut at no more th...

Page 19: ...ecolibriumsolar com Strut Installation Note Strut may need to be cut and or spliced to meet the attachment requirements in the project s Ballast Layout Plan or engineering report Splice Strut and install hardware as shown All hardware is included in the Strut Kit Splice Kit ...

Reviews: