Introduction 

EcoFoot5D

TM

 is a 5-degree ballasted racking system designed to fit more modules on a roof, maximizing power 

density. The modular design is built on the proven, industry-preferred, beautifully simple and fast-to-install 
modular technology of the EcoFoot platform and sister product, E.  

 

EcoFoot5D consists of five simple components. Installation is accomplished in six simple steps. Much of the 
installation is tool-less. 

 

EcoFoot5D Bases self-align, requiring only two chalk lines. The PV module installation automatically moves the 
Bases into perfect placement. Inter-row ballast placement and easy-reach wire management provide superior 
accessibility during and after installation. 

 

Stackable Bases enable the transport of up to 290kW of Bases on 1 standard pallet, streamlining logistics. The 
combined effect of simplicity, maximum density, and minimized shipping, storage and transporting costs results 
in an ultra cost-effective racking solution.  

Field Support Contact Information 

Ecolibrium Solar proudly offers dedicated engineering expertise and superior customer support. For questions 
about the installation procedures or a specific application, please contact our Field Support Specialists at 866-
488-6794 or [email protected].  

Installer Responsibility 

The installer is solely responsible for:  

 

Utilizing all necessary safety equipment, as required by applicable rules and regulations.  

 

Complying with all applicable local and national building codes, including any that may supersede this 
manual.  

 

Ensuring that Ecolibrium Solar® EcoFoot5D

TM

 and other products are appropriate for the specific 

installation and are designed for the installation environment.  

 

Ensuring that the roof, its rafters, connections, and other structural support members can support the 
array under all conditions.  

 

Maintaining the waterproof integrity of the roof including selection of appropriate flashing if the 
system is being installed using attachments.  

 

Ensuring safe installation of all electrical aspects of the entire system 

Disclaimer of Liability  

ECOLIBRIUM SOLAR® does not assume responsibility and expressly disclaims liability for loss, damage, or 
expense arising out of, or in any way connected with installation, operation, use, or maintenance by using this 
manual. 

ECOLIBRIUM SOLAR assumes no responsibility for any infringement of patents or other rights of third parties, 
which may result from use of modules. No license is granted by implication or under any patent or patent rights. 
The information in this manual is believed to be reliable, but does not constitute an expressed and/or implied 
warranty. 

ECOLIBRIUM SOLAR reserves the right to make changes to the product, specifications, data sheets and this 
manual without prior notice. This document is not prescriptive regarding safety and does not purport to 
address all the safety concerns that may arise with its use. Contractors should become familiar with all 
applicable safety, health, and regulatory requirements before beginning work. 

Summary of Contents for EcoFoot5D

Page 1: ...riumSolar com Field Support 866 488 6794 FieldSupport EcolibriumSolar com www ecolibriumsolar com Installation Guide Installation Guide EcoFoot5D High Density 5 Degree Ballasted Racking System Document No ES10560 Rev 1 1 January 2018 ...

Page 2: ...ide V1 1 FINAL Page 2 of 19 January 25 2018 ES10560 ecolibriumsolar com Revision History Revision Description of Changes Date 1 0 Initial EcoFoot5DTM Release 2017 September 05 1 1 Add Attachment Appendix B 2018 January 25 ...

Page 3: ...sibility 4 Disclaimer of Liability 4 Warnings Safety 5 EcoFoot5D General Application Notes 5 EcoFoot5D Core Components 7 Install EcoFoot5D in 6 Simple Steps 8 Appendix A Grounding Bonding 11 Appendix B Roof Attachment Methods 12 Legal Notices 2017 Ecolibrium Solar Inc Ecolibrium Solar and EcoFoot2 are registered trademarks of Ecolibrium Solar Inc EcoFoot5D is a trademark of Ecolibrium Solar Inc re...

Page 4: ...ty equipment as required by applicable rules and regulations Complying with all applicable local and national building codes including any that may supersede this manual Ensuring that Ecolibrium Solar EcoFoot5DTM and other products are appropriate for the specific installation and are designed for the installation environment Ensuring that the roof its rafters connections and other structural supp...

Page 5: ...hen working with or near electrical systems Always provide OSHA approved fall protection for all installation personnel Never wear jewelry during mechanical and electrical installation work Never work in rain snow or extremely windy conditions Never leave a module unsupported or unsecured on the roof Never install broken photovoltaic modules EcoFoot5D General Application Notes Site Specific System...

Page 6: ...e to be immediately replaced Compatible Modules Ecolibrium Solar has evaluated many photovoltaic modules for installation compatibility with the EcoFoot5D ballasted racking system A list of compatible modules may be found in EcoFoot5D Install Guide Appendix Compatible Modules pdf on our website www ecolibriumsolar com UL2703 Qualification In cases where UL 2703 certification is required the EcoFoo...

Page 7: ...coFoot5D Base 2 Universal Clamp Lower 3 Universal Clamp Upper 4 Clevis Pins 5 Wind Deflector 6 Ballast Tray 7 Mid Support Upper 8 Mid Support Lower 9 5 16 Thread Forming Screw Hardware Required All required hardware is included Tools Required Deep Socket Calibrated Torque Wrench Torque Settings 14 ft lbs on all Fasteners ...

Page 8: ...ocker Step 2 Position Array 2 1 Snap two chalk lines on roof denoting outside edges of the EcoFoot5D Bases per project drawing Start from the north or south edge Ensure chalk lines are square 2 2 Place EcoFoot5D Bases in approximate position throughout the array Installation Tips Only install Clamps where modules will rest See Step 3 for correct placement and orientation of Clamps Base Lower Clamp...

Page 9: ...e south row the Upper Mid Support will not be pressed onto a module frame On the north row the Lower Mid Support will not be pressed onto a module frame 4 3 Slide Upper and Lower Mid Support together using the male female features If required place optional self adhering EPDM pads on the bottom surface of the Upper and Lower Mid Supports Nut Base Module Nut PV Module Center Point Upper Lower Mid S...

Page 10: ...Kit Torque Screw to 14 ft lbs 5 3 Place ballast not included in a single layer evenly dispersed along the length of Ballast Trays Apply ballast per the ballast plan specified in the PE Certified Ballast Plan Sheet S 1 0 Step 6 Install Wind Deflector 6 1 Place Wind Deflectors into slot on EcoFoot5D Base and attach to Rocker using Nut provided 6 2 Torque Nut to 14 ft lbs using a deep socket Applicat...

Page 11: ...d Deflector a minimum of from any edge One Ground Lug is required for every 400 modules connected within an array Ecolibrium Solar recommends using 6 copper ground wire in conjunction with WEEB grounding devices such as the WEEB LUG 6 7 or WEEB DSK516 Lugs are a single use component Other grounding methods must be reviewed and approved by a licensed master electrician or electrical engineer and Au...

Page 12: ...ing Attachment Methods Seismic and Uplift Attachment Seismic Attachment Modules with Type 1 Fire Code Rating Use Attachment with Strut Modules with Type 1 2 Fire Code Rating Use Attachment with Ballast Tray Modules with Type 1 2 Fire Code Rating Use Attachment with Ballast Tray and Strut Attachment with Strut Attachment with Strut Components included in Kit 1 L Bracket 2 x3 Qty 3 2 Elevator Bolt 1...

Page 13: ...d Flange Nut 1 2 Roof Attachment Place L Bracket on Stud and secure with 3 8 16 Serrated Flange Nut Step 2 Install Flat Plate or Station Anchor Roof Attachment 2 1 Align L Bracket of Roof Attachment with L Brackets on Bases and install Roof Attachment on either side of the Mid Support Install Roof Attachment per Roof Attachment manufacturer s instructions Elevator Bolt L Bracket Flange Nut Line be...

Page 14: ...ep 3 Attach Strut to L Brackets and Tighten Hardware 3 1 Secure Strut to L Brackets with 3 8 16 Serrated Hex Bolt and 3 8 16 Strut Nut Engage grooves of Strut Nut with the two lips within Strut 3 2 Tighten and torque all hardware Torque 20 hardware to 8 ft lbs Torque 3 8 16 hardware to 14 ft lbs ...

Page 15: ...4 Bolt Serrated Flange 1 4 20 Qty 4 5 Nut Serrated Flange 3 8 16 Qty 2 Not Included in Kit Roof Attachment Flat Plate Optional Addition of Strut to Ballast Tray Components Included in Kit 1 Screw Sheet Metal 12 x Qty 6 2 Washer Fender ID x 1 OD Qty 6 Not Included in Kit Strut 1 5 8 x 1 5 8 Torque Settings 8 ft lbs for 1 4 fasteners 14 ft lbs for 3 8 fasteners 5 ft lbs for sheet metal screws Tools ...

Page 16: ...t Tray install Roof Attachment per manufacturer s instructions Note Position the attachment such that it can share the same slot with the Mid Support as shown Step 2 Install Mid Span Support 2 1 Refer to Step 4 of the Installation Guide to install Mid Span Support Step 3 Install Hardware on Attachment Stud 3 1 Install 3 8 16 Serrated Flange Nut and 7 16 ID x 1 OD Washer onto Roof Attachment stud L...

Page 17: ...ay Line up slots with attachment stud base hardware and Mid Support 5 2 Torque fastener into Mid Span Support to 14 ft lbs through slot on Ballast Tray 5 3 Fasten Ballast Tray to base with Washers and Serrated Hex Bolts on both bases Torque to 8 ft lb 5 4 Install Washer and Serrated Flange Nut onto Preferred Roof Attachment in order shown below Torque Serrated Flange Nut to 14 ft lbs 5 5 Roof Atta...

Page 18: ...length of Ballast Trays centering Strut over Roof Attachment 6 2 Install two Sheet Metal Screws and Fender Washers on either side and as close to the roof attachment stud as possible Install additional screws along the length of the strut at no more than 24 intervals Strut reinforcement attachment complete Sheet Metal Screws with Fender Washers installed along the length of the strut at no more th...

Page 19: ...ecolibriumsolar com Strut Installation Note Strut may need to be cut and or spliced to meet the attachment requirements in the project s Ballast Layout Plan or engineering report Splice Strut and install hardware as shown All hardware is included in the Strut Kit Splice Kit ...