![Ecolab Elados EMP E60 Series Short Operating Instructions Download Page 27](http://html1.mh-extra.com/html/ecolab/elados-emp-e60-series/elados-emp-e60-series_short-operating-instructions_2354525027.webp)
4
Device installation
Personnel:
n
Mechanic
n
Qualified electrician
n
Service personnel
n
Specialist
Protective equipment:
n
Protective eyewear
n
Chemical-resistant protective gloves
n
Safety shoes
NOTICE!
Chapter 2.1 ‘General safety advice’ on page 4
information on the arrangement of the metering pump, pressure
maintenance valve, injector valve etc., as well as on the types and
installation of the hose pipes.
4.1
Hydraulic Connections
4.1.1
Hydraulic Connections - EMP KKS
Saug- und Rücklaufleitung
1
2
3
4
5
R
S
1
Union nut
2
Clamping piece
3
Tapered part
4
O-ring
5
Fixing hole
R
Return pipe
S
Suction pipe
n
Separate double-hose according to the diagram, cut it straight and
remove the connecting bridge.
n
Depending on the point of connection (suction or return flow side), cut to
different lengths (take care in making an even cut)!
n
Push the return flow hose through the fixing hole (pos. 5).
n
Push the union nut (pos. 1) and clamping piece (pos. 2) over the suction
hose piece.
n
Attach the tapered part (pos. 3) until stop motion.
n
Put the O-ring (pos. 4) in valve groove and screw down the union nut by
hand.
Device installation
10
MAN033535 Rev. 06-04.2020
Summary of Contents for Elados EMP E60 Series
Page 53: ......