417101733_Ecotrans.doc
- 20 -
Rev. 2-03.10
5.
Structure/mounting
5.1
Structure
Fig. 5.1
Pos.
Description
1
Display
2
Calibration adjustment pH 4/9
3
Calibration adjustment pH 7
4
pH sensor connection
5
Standard signal output
6
Mains connection
5.2
Drilling plan
Fig. 5.2
The dimensions shown in this drilling plan enable the
Ecotrans
to be mounted on a wall using four suitable
screws and rawlplugs.
5.3
Mounting
Select the installation site for the Ecotrans and drill four holes as per the drilling plan
Insert suitable rawlplugs into the drilled holes
Unscrew the four cover screws on the Ecotrans
Remove the cover
Insert the appropriate fastening screws through the openings in the housing
Screw the screws into the rawlplugs and tighten them by hand