15
2. Remove Sonalert from the side of the I/O enclosure box
a. Disconnect the lead wires from the Sonalert
b. Unscrew retaining nut and discard the sonalert and wires
3. Remove existing Apex controller board and cover assembly by pulling the
cover from the Apex I/O enclosure.
a. With the cover open, and approximately horizontal, pull the cover
straight off from the I/O enclosure, causing the cover to unsnap from
the stainless steel hinge pin.
b. Do not throw the Apex board into the garbage! The board must be
disposed of properly
c. Ship to:
Ecolab
Hwy 251 & Rockton Rd.
South Beloit, IL 61080
4. Install the supplied RS-485 cable sealing assembly through the Sonalert
hole.
a. Assemble the two threaded fittings around the RS-485 cable. There
should be approximately 8” (20cm) of cable exposed from the end of
the fittings
b. Place the assembly into the empty Sonalert hole and secure using the
threaded.
Figure 4.17
Figure 4.18
Figure 4.19
Figure 4.20