![ECOFOREST Atenas Installation And Maintenance Manual Download Page 38](http://html1.mh-extra.com/html/ecoforest/atenas/atenas_installation-and-maintenance-manual_2354364038.webp)
37
Drawing 23
IMPORTANT:
If the stove is operating while full of ash or residues, that might stretch the basket and its
support, the ashtray basket and even the fire basket, being the cause of bad operation or possible breakdown.
MAINTENANCE AT END OF SEASON OR EVERY 500 KG OF FUEL
.
This is necessary to ensure correct operation and maintain the stove’s life duration. When winter ends,
contact your provider (if he did not contact you) and meet to carry out this maintenance; the following shall be done
(the stove must always be disconnected from power):
5.6.
Cleaning the fireplace.
In addition to daily cleaning carried out with great attention, the following items must be cleaned:
Heat exchanger pipes. By activating the drawers of the rake. If you have a Eco II or Kerala model, remove
the top plate of the fireplace as indicated in section
5.1.
Burn pot.
Burn pot support.
Ash box.
Air entrance pipe.
Screws of Mobile parts.
5.7.
Cleaning of the exhaust circuit of the
stove
, cleaning outlets and collector. Always with the stove unplugged.
(Very Important).
To Access to the cleaning outlets, you must open the side doors by removing the screws that keep them
closed, two by each door. Once you have access to these outlets, you must clean it properly, using a wire
brush which is provided with the keyboard in a box. The proper functioning of the stove will depend on its
cleaning.
In the Insert models Ecoaire and Eco II (
Drawing 24
) you must pull from the stove until having access to the
back part and, this way, to the cleaning outlets.
Drawing 24
Fireplace door.
Ash box.
Cleaning outlet.
Summary of Contents for Atenas
Page 1: ......
Page 111: ...110 9 MEDIDAS MEASURES MESURES MISURES MEDIDAS ECOAIRE EC UNE EN 14785...
Page 112: ...111 10 MEDIDAS MEASURES MESURES MISURES MEDIDAS ECOAIRE INSERT EE UNE EN 14785...
Page 114: ...113 12 MEDIDAS MEASURES MESURES MISURES MEDIDAS ECO II INSERT EAM UNE EN 14785...
Page 116: ...115 14 MEDIDAS MEASURES MESURES MISURES MEDIDAS ATENAS VR 2012 UNE EN 14785...