For parts or assistance, call ECO-FLO Customer Service at 1-877 326-3561
INSTALLATION
Driven Point Installation-Figure 2
1. Connect suction pipe to drive point (Fig. 2).
Keep horizontal pipe run as short as possible.
Use Teflon tape on male pipe threads. Multiple
well points may be necessary to provide
sufficient water to pump.
2. Install check valve in horizontal pipe. Flow
arrow on check valve must point toward pump.
Surface Water Applications- Figure 3A and 3B
A. Vertical from Surface Water to Pump.
1. Foot Valve with Strainer attached to PVC
pipe.
2.
Install check valve in horizontal pipe.
B. Horizontal from Surface Water to Pump
1. Attach Foot Valve to PVC pipe
2. Next attach the Strainer Basket to Foot Valve
3. Install check valve in horizontal pipe.
Figure 2
Driven point installation,
multiple well points
To sprinkler
heads
Discharge pipe
Gate valve
Gate valve
To sprinkler heads
Check
valve
Multiple
well heads
Check
Valve
Strainer Basket
Foot Valve
with Strainer
Figure 3A - Vertical
Figure 3B - Horizontal