![Eco Engineering Easypell 16 Installation Manual Download Page 42](http://html1.mh-extra.com/html/eco-engineering/easypell-16/easypell-16_installation-manual_3989578042.webp)
42
Commissioning controller version B
112
2..2
2..11 C
Co
om
mm
miis
ss
siio
on
niin
ng
g c
co
on
nttrro
olllle
err v
ve
errs
siio
on
n B
B
After switching on, the boiler starts (after approx. 10
seconds).
The fire protection device is opened.
This symbol appears on the display while the fire protec-
tion device is being opened (approx. 2 minutes).
After the fire protection device has been opened, the ig-
nition process starts and the symbol for ignition is
displayed.
On completion of the ignition process (can last up to 15
minutes), the symbol for heating at full power appears.
The boiler is now heating at full power.
200014_EN 1.2
Summary of Contents for Easypell 16
Page 1: ...Installation Manual Easypell 16 32kW ENGLISH 200014_EN 1 2 www easypell com...
Page 18: ...18 Dismantling the burner casing and burner 200014_EN 1 2...
Page 56: ...56 Retrofit motor cleaning device 200014_EN 1 2...
Page 57: ...Retrofit motor cleaning device 57 Installation Manual Easypell 16 32kW...
Page 63: ......