Flue pipe Installation

Fig. 29

shows the proper flue gas connection with additional air equipment. Observe the following during the installation of the

flue gas connection:

     Install a flue pipe connection with an inspection aperture for cleaning.

     Fasten the flue gas connector piece to the boiler.

     Feed the connector into the flue gas system on a short, ascending path. Avoid deflections, especially those with an angle of 90°.

     Fasten and support connectors sufficiently.

     Since the flue pipe is only fixed into the flue gas system and push-fitted onto the boiler flue socket, it should be fitted very

carefully so that it does not come loose.

     Only use parts of non-flammable materials for the flue gas system.

fig.29

Chimneys and chimney connection warnings

A sufficient flue draft of the flue gas system is the basic requirement for the correct functioning of the boiler.

It fundamentally affects its performance and efficiency. Therefore, heed the following for the flue gas connection:

     Please note that the boiler must be connected to the flue gas system in accordance with the latest recommendations form Hetas.

     Building code regulations, manufacture’s instructions and in consultation with an approved flue installer.

     The boiler may only be connected to a flue gas system with proper flue draft (technical spec. table).

     The dimension calculations of the flue gas path must be based on the flue gas mass-flow rate at maximum rated output.

     The effective chimney flue height is measured from the point of entry of the flue pipe into the chimney.

     Ensure that the calculation of the flue gas path and the connection of the flue gas system is only carried out by qualified personnel.

     If a wrong boiler chimney is connected, the warranty is not valid.

Summary of Contents for Evo Multi Fuel Boiler

Page 1: ...Angus Evo Multi Fuel Boiler Installation Operation and Maintenance Manual...

Page 2: ...rols 13 Starting a fire 13 Setting outlet water temperature 13 Stoking 14 Overnight heating mode 14 Removing solid combustion residuals 14 Dewing and tarring 14 Boiler shutdown 14 Short term shutdown...

Page 3: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL 1 Information on the boiler plate The boiler Serial No is shown on the plate which is attached to the cover panel of the cast iron body fig 01...

Page 4: ...MANUAL 2 Boiler dimensions fig 02 Boiler packaging dimensions fig 03 EV 03 EV 04 EV 05 EV 06 L mm 609 709 809 909 EV 03 EV 04 EV 05 EV 06 L mm 665 765 865 965 Notice Please obey to the meanings of th...

Page 5: ...e Control C 30 90 Maximum Pressure of System bar 4 Minimum Pressure of System bar 0 4 Boiler Water Content L 16 33 20 30 24 27 28 24 m3 0 01633 0 0203 0 02427 0 02824 Exit Flue Connection Diameter mm...

Page 6: ...be increased approximately 10 FOR COAL MODEL HEAT OUTPUT kW HEAT OUTPUT kCAL MAX HEATING AREA UNC M2 Solid Fuel 03 17 14 617 146 Solid Fuel 04 27 23 216 232 Solid Fuel 05 34 29 235 292 Solid Fuel 06...

Page 7: ...ep the original packaging until the boiler has been put into service in case the boiler has to be transported again 11 When making any repairs only original parts must always be used It is forbidden t...

Page 8: ...iler body is equipped with necessary pipe sections for water connection It also has brackets for fitting thermostat sensors and brackets on feet for fastening the boiler to the base Attached to the ca...

Page 9: ...ing the safety and the control elements remember to meet the principles of work safety If replacing of safety device and of thermo mechanical output regulator is necessary please use recommended devic...

Page 10: ...Temperature safety valve The Angus Evo boilers can be equipped with a safety heat exchanger with thermal safety valve as an optional which ensures dissipation of excessive heat without additional devi...

Page 11: ...p 3 Cold Water Feed 8 Heating System 4 System Safety Valve 3 bar 1 2 9 Open Expansion Tank 5 NRV Open type expansion tank must be equipped with the highest level in the entire hydraulic system The exp...

Page 12: ...sion Tank 5 Four Way Mixing Valve 3 Radiator fig 11 1 Boiler 2 Laddomat 21 60 operated by Flue Thermostat 50 300 C 3 NAD or NADO Accumulator Tank 4 Immersion Heater 5 Three Way Mixing Valve 6 Circulat...

Page 13: ...en for an appropriately sized expansion vessel on the central heating circuit before the return to the boiler and a safety group on the primary flow It is essential to ensure that the expansion vessel...

Page 14: ...AL 12 fig 15 fig 16 1 Boiler 2 Safety Group automatic air vent pressure reducing valve and pressure gauge 3 DHW Cylinder 4 CH Pump 5 Heating System 6 Four Way Mixing Valve 7 NRV 8 Expansion Vessel 9 A...

Page 15: ...with the boiler cold or cooled down otherwise the boiler segments may crack Operation and controls Starting a fire Check on the thermo manometer whether there is enough water in the heating system Ope...

Page 16: ...the boilers inside walls When running the boiler with low water temperature usually below 65 C or when using damp fuel water condensates in combustion gases and the condensate runs down the boiler s...

Page 17: ...esult in inadequate chimney thrust The boiler must be cleaned regularly at least once a month which is done with a steel brush through an open boiler door After taking front section plate off all boil...

Page 18: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL 16 fig 19 fig 20 fig 21 fig 22...

Page 19: ...ways be used Warranty and warranty conditions Angus Evo boilers are covered by warranty specified in the Warranty Certificate Service Book and User and Installation Guide chapter Introduction Installi...

Page 20: ...essure We recommend installing a sludge trap upstream of the boiler i e on hot water return pipe The sludge trap design should allow emptying in regular intervals without the need to drain a lot of ho...

Page 21: ...g the entire depth of the boiler body If the boiler is installed in a cellar we recommend to put it on a socket at least 50mm high positioning the boiler in the middle To comply with standards at leas...

Page 22: ...utlet when the boiler is operating Installation procedure Place the boiler body on a non flammable materials Install a thermal safety valve After connecting the boiler to the heating system screw fill...

Page 23: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL 21 Angus Evo boiler parts fig 25 fig 26...

Page 24: ...EV PM 140 EV PM 140 EV PM 140 25 Thermostat Bulb Segment EV 20080124 EV ST 141 EV ST 141 EV ST 141 EV ST 141 26 Stopper 3 4 EV 20080125 EV PM 131 EV PM 131 EV PM 131 EV PM 131 27 Thermostatic Regulato...

Page 25: ...essary when the required volume is less than 300L Transportation and storage The manufacturer handles the boiler that is on a palette and secured against shifting with screws The boiler may not be tra...

Page 26: ...arnings A sufficient flue draft of the flue gas system is the basic requirement for the correct functioning of the boiler It fundamentally affects its performance and efficiency Therefore heed the fol...

Page 27: ...ted Boiler is heating but radiators are not Quality of the fuel might be low and or the moisture content of the fuel maybe high Operational instructions are not fulfilled Tar existing on surface of he...

Page 28: ...For more information please visit our website www ecoangus co uk 01934 862642 07739 174511 07970 901273 ecoangus aol com 2068 Designed and produced by...