
ECHO
DIRECT VENT GAS HEATER
42
APPENDIX A – ECHO STOVE WITH LOG & EMBER TRAY PLACEMENT
Following is a step-by-step procedure for installing the Echo log set:
1.
Remove top lid and top from stove. Unhook
glass door latch (at bottom of stove) and lift
out glass door.
2.
Install Log #1 as per picture below.
3.
Install Log #2 as per picture below.
4.
Install Log #3 as per picture below.
5.
Install Log #4 as per picture below.
6.
Install Log #5 as per picture below.
Summary of Contents for DIRECT VENT GAS HEATER
Page 9: ...ECHO DIRECT VENT GAS HEATER 9 LABORATORY LISTING LABEL...
Page 10: ...ECHO DIRECT VENT GAS HEATER 10 FIGURE 1 DIAGRAM OF DIMENSIONS...
Page 14: ...ECHO DIRECT VENT GAS HEATER 14 FIGURE 3 VENT TERMINATION LOCATIONS...
Page 17: ...ECHO DIRECT VENT GAS HEATER 17 FIGURE 6 DIAGRAM OF VENTING REQUIREMENTS...
Page 22: ...ECHO DIRECT VENT GAS HEATER 22 FIGURE 14 VENTING REQUIREMENTS...
Page 23: ...ECHO DIRECT VENT GAS HEATER 23 FIGURE 15 VENTING CHART 18...
Page 28: ...ECHO DIRECT VENT GAS HEATER 28 FIGURE 20 LOCATION OF PILOT BURNERS AND AIR SHUTTER...
Page 30: ...ECHO DIRECT VENT GAS HEATER 30 FIGURE 21 DIAGRAM OF CONTROL COMPONENTS...
Page 31: ...ECHO DIRECT VENT GAS HEATER 31 FIGURE 22 AIR RESTRICTOR See Figure 25 and Figure 26...
Page 32: ...ECHO DIRECT VENT GAS HEATER 32 FIGURE 23 GAS VALVE AND PILOT ASSEMBLY...
Page 45: ...ECHO DIRECT VENT GAS HEATER...