
ECHO
DIRECT VENT GAS HEATER
41
FIGURE 27 – FAN HOUSING INSTALLATION
Installation of Fan Housing and Blower
1.
Remove lower back cover as per drawing (8 screws)
2.
Install new fan housing with blower mounted onto back in same position (as per drawing). Install sensor
using pre-drilled holes.
3.
Install line cord into wall receptacle and into fan housing.
The stove fan will come on automatically when heater gets hot (15/20 minutes). Use the speed control to adjust
the fan air speed.
Summary of Contents for DIRECT VENT GAS HEATER
Page 9: ...ECHO DIRECT VENT GAS HEATER 9 LABORATORY LISTING LABEL...
Page 10: ...ECHO DIRECT VENT GAS HEATER 10 FIGURE 1 DIAGRAM OF DIMENSIONS...
Page 14: ...ECHO DIRECT VENT GAS HEATER 14 FIGURE 3 VENT TERMINATION LOCATIONS...
Page 17: ...ECHO DIRECT VENT GAS HEATER 17 FIGURE 6 DIAGRAM OF VENTING REQUIREMENTS...
Page 22: ...ECHO DIRECT VENT GAS HEATER 22 FIGURE 14 VENTING REQUIREMENTS...
Page 23: ...ECHO DIRECT VENT GAS HEATER 23 FIGURE 15 VENTING CHART 18...
Page 28: ...ECHO DIRECT VENT GAS HEATER 28 FIGURE 20 LOCATION OF PILOT BURNERS AND AIR SHUTTER...
Page 30: ...ECHO DIRECT VENT GAS HEATER 30 FIGURE 21 DIAGRAM OF CONTROL COMPONENTS...
Page 31: ...ECHO DIRECT VENT GAS HEATER 31 FIGURE 22 AIR RESTRICTOR See Figure 25 and Figure 26...
Page 32: ...ECHO DIRECT VENT GAS HEATER 32 FIGURE 23 GAS VALVE AND PILOT ASSEMBLY...
Page 45: ...ECHO DIRECT VENT GAS HEATER...