PRODUCT WATER TUBING
Connect the blue product water tubing or the 1/2" vinyl hose from the center fittings of the membrane
housing(s) to the bottom inlet of the flow meter, in the control panel. Connect the tubing or hose from
each output port of the 3-way valve to your water tank and to the taste/test station of your choice.
CAUTION: UNDER NO CIRCUMSTANCES SHOULD THE PRODUCT WATER LINE BE
ALLOWED TO BECOME BLOCKED WHILE THE SYSTEM IS RUNNING. DO NOT
INSTALL SHUT-OFF VALVES ANYWHERE IN THIS LINE.
CAUTION: DO NOT ALLOW CHLORINATED WATER FROM YOUR STORAGE TANK TO
FLOW BACK INTO THE R.O. MEMBRANE.
You may directly “T” your product water line into the tank vent (Refer to the Flow Diagram). This
avoids chlorinated
water to back flow from your water tanks into the R.O. membrane and does not
require a new fitting in your tank.
When using a spigot as the taste/test station, be sure you have no shut-off valves in the product water
line. A hand pump style spigot, with a check valve
only
, is acceptable. If using this type of spigot for
two sources, install a low-pressure check-valve in the product line and “T” it into the existing hand
pump spigot line.
REJECT WATER TUBING/HOSE
Connect the outlet of the pressure control valve on the control panel with a reject thru-hull of your
choice (preferably above the water line).
ELECTRICAL INSTALLATION
The electrical installation should only be done by a professional electrician according to the local
regulations with regards to safety. Therefore electrical installation materials are not supplied. It
is essential to properly ground all components in contact with electricity.
Summary of Contents for 200-AMS-1
Page 18: ......