background image

16

|

 

P a g e

 

 

E580 Defra instructions manual | 

current as of May 2015 

 
All information supplied by 

Ecco Stove

TM

 is a trade mark of Landy Vent UK Limited      

     copyright©EccoStove2015                   

Ecco Stove

 | Foster House

 | 2 Redditch Road,

Studley,

B80 7AX, United Kingdom 

 

T

  |   +44 (0)1527 857 814          

 |  [email protected]         

 |  www.eccostove.com   

Patent pending USA, Canada, Europe & Russia  |  UK Patent nos: 2467433 & 2498883

 

 
APPLIANCE ASSEMBLY 
Silicon Carbide parts are both heavy and can be damaged.  Lifting by two people is 
recommended. 
a)

 

Base Section   To be placed on a level structural  
hearth  capable of bearing 200kg.  The hearth  
must be laid level and the stove positioned a 
 minimum of 75mm away from a non- 
combustible wall to allow space the  outside 
 control assembly or 350mm from sides and 200 
mm from stoves rear to a combustible  
wall.  
 
 
 

b)

 

Grate Section   Fit cone shaped diablos into          
the sockets of the base section to locate the 
 grate section. Place the grate section on and 
 bump into position with a rubber mallet to  
bed in. 
 
 
 
 
 
 

c)

 

Side Sections    Place the cone shaped diablos      
 into the sockets on the grate section.  Place 
 both side sections into place and bump 
vertically down to bed in. 
 

d)

 

Back Panel  Fit the back panel between the           
sides, it may help to spread the sides a little 
 at their tops to easily fit the back in.   
Ensure the circular Tertiary hole is towards  

Summary of Contents for E580

Page 1: ...ng immediate action should be taken a Open doors and windows to ventilate the room and then leave the premises b Let the fire go out c Check for flue or chimney blockage and clean if required d Do not...

Page 2: ...ster in the devolved administrations Further information on the requirements of the Clean Air Act can be found here http smokecontrol defra gov uk Your local authority is responsible for implementing...

Page 3: ...dom T 44 0 1527 857 814 E sales eccostove com W www eccostove com Patent pending USA Canada Europe Russia UK Patent nos 2467433 2498883 e OPERATION WITH DOOR OPEN 14 ASH REMOVAL 15 FUELS a WOOD 16 REF...

Page 4: ...eg Building Regulations in the UK The installer must be aware that all local regulations including those referring to National and European standards must be complied with when installing this applian...

Page 5: ...ccess plate within 200mm of the stoves top for access for flue ways cleaning which are located beneath the stoves top and forward of the flue outlet The Ecco Stove E580 must have its own dedicated flu...

Page 6: ...estarting the stove when the glass is cold using a damp cloth and ash from the stove s grate as a cleaner 7 AERATED BACK PLATES Panels The back panels pre drilled panels at the rear of the stove are c...

Page 7: ...tape must be used Door ropes should be replaced with 8mm rope and ash pit seal should be replaced with 10mm flat tape adhered with rope adhesive when showing signs of wear or after 2 years whichever c...

Page 8: ...imum operating temperature of 150 C on the top plate c SECONDARY AIR Secondary air is automatically fed into the fire box as in Primary and Tertiary air with no other control available This secondary...

Page 9: ...on with the air controls or appliance dampers open can cause excess smoke The appliance must not be operated with air controls appliance dampers or door left open except as directed in the instruction...

Page 10: ...only 3 minutes or so to start the new fuel charge into initial combustion then again fully closed for normal operation b SUBSEQUENT FIRING Re starting the fire after its initial firing should be carr...

Page 11: ...ial combustion is underway add a 3kg batch of wood laid across the fire box Continue running as such until the stoves top reaches a minimum of 160 180 C when the ash pan for secondary and tertiary air...

Page 12: ...e period If there are too few embers in the fire bed add suitable kindling to prevent excessive smoke e OPERATION WITH DOOR LEFT OPEN Operation with door left open can cause excess smoke The appliance...

Page 13: ...s on a full 3kg charge subject to how you intend to run the stove and the heat output you are looking for Either way burn the fuel charge into full combustion then close the ash pit drawer for the sec...

Page 14: ...asons burning Any joints between pipes and linings should be self tapped together 6 linings are suitable for flue heights up to 9 metres 7 linings should be used above 9 metres in height High temperat...

Page 15: ...nish your Ecco Stove will give off a noxious smell for a number of initial firings as the heat from the stove cures the paint in place If and when this occurs open doors and windows in the room to ven...

Page 16: ...f bearing 200kg The hearth must be laid level and the stove positioned a minimum of 75mm away from a non combustible wall to allow space the outside control assembly or 350mm from sides and 200 mm fro...

Page 17: ...lat mating faces to adequately seal e Ash Can and grate Spacer Block Fit the ash can Assembly into the grate section fit the 2 spacer blocks to distance the back boards off the back wall Fit the grate...

Page 18: ...el pins a must be fitted into the 2 holes either side of the side walls above the inner SIC side cheeks onto which the Silicon Carbide baffle block must locate firmly over the these four pins The lowe...

Page 19: ...l depth of 800mm UK minimum which allows includes 75mm gap for the stove off the rear non combustible wall 200mm to a combustible wall to accommodate the rear air control These dimensions must be chec...

Page 20: ...E ROOM AS THIS APPLIANCE TO CONFORM TO UK REQUIREMENTS OF INSTALLATION k Efficiency 80 4 l Minimum distances to combustibles Rear 250mm Sides and top 300mm Minimum distances to non combustibles Rear 7...

Page 21: ...with the skin is made Asbestos This stove contains no asbestos If there is a possibility of disturbing asbestos in the course of installing this stove seek specialist advice immediately and use approp...

Page 22: ...d trigger TR5 1 Rope seal 8mm x 1400 mm long RS1 1 Flat tape seal FT1 1 Glass ladder back tape seal L 6mmx1260mm LBT1 KT653 1 Vermiculite spacer block SP5 1 Vermiculite Back Board VBB5 1 Silicon carbi...

Page 23: ...used slowly releasing heat may be left after its last firing for many hours with the stove pipes damper if fitted closed to slowly release heat into the house on a falling heat Should it be preferred...

Page 24: ...at you get the best from your Ecco Stove E580 Operating it properly is essential for this type of appliance to get the correct results Always ask for help if you are unsure 2 Warranty Conditions This...

Page 25: ...co Stove E580 Internal flue cleaning at least twice during a burning season when your stove is in constant use along with flue sweeping twice annually 6 Replacement Parts The Company reserves the righ...

Page 26: ...ouse 2 Redditch Road Studley B80 7AX United Kingdom T 44 0 1527 857 814 E sales eccostove com W www eccostove com Patent pending USA Canada Europe Russia UK Patent nos 2467433 2498883 In the interest...

Page 27: ...Europe Russia UK Patent nos 2467433 2498883 ADDRESS POSTCODE OR ZIPCODE TELEPHONE NUMBER INSTALLERS REGISTERED BODY AND NUMBER DATE THE ECCO STOVE WAS INSTALLED SELLING AGENT DEALER COMPANY NAME ADDRE...

Reviews: