Ebsray R75 Installation, Operation & Maintenance Instructions Manual Download Page 6

Publication No.: 2753-20 

 

Table 1: Torque required for bolted connections 

SECTION 5 - MAINTENANCE 

 

Failure to set the vehicle emergency 
brake and chock wheels before 
performing service can cause severe 
personal injury or property damage. 

 

 

Failure to relieve system pressure prior 
to performing pump service can cause 
serious personal injury or property 
damage.

  

Systems with meters will still 

be pressurized even after the hose is 
emptied

 

 

 

 

Hazardous 

machinery can 

cause serious 

personal injury.

 

 

Hazardous pressure 

can cause serious 

personal injury or 

property damage 

 

 

Failure to disconnect and lockout 
electrical power or engine drive before 
attempting maintenance can cause 
severe personal injury or death 

 

 

Disconnecting fluid or pressure 
containment components during pump 
operation can cause serious personal 
injury or property damage. 

 

 

 

Hazardous 

machinery can 

cause serious 

personal injury.

 

 

Hazardous pressure 

can cause personal 

injury or property 

damage 

 

 

 

 

 

5.1 

ROUTINE MAINTENANCE AND INSPECTION 

NOTE: 

Maintenance shall be performed by qualified technicians 

only, following the appropriate procedures and warnings 

as presented in this manual.

 

Routine maintenance and inspections can be performed with the 
pump ‘in-situ’, so long as complete isolation, depressurising and 
purging  procedures  have  been  completed.  However  for 
repair/overhaul,  it  is  recommended  that  the  pump  be  removed 
from the installation. 

The R75, R77, R80 and R82 ball bearings are sealed for life.  As 
such there are NO routine maintenance requirements. 

Ebsray recommends a maximum interval of three months or 500 
hours  operation  between  routine  inspections  (More  frequent 
inspections  may  be  necessary  dependent  upon  usage,  site 
conditions,  and  operation).    These  inspections  should  include 
(but not limited to) checking for; 

 . Leakage from the pump, pipework, valves etc. 

 Excess vibration/noise. 

 Excessive heat from the Pump or hydraulic system. 

5.2 

MAINTENANCE 

– REPAIR AND OVERHAUL 

If the pump is being sent to Ebsray for maintenance or repair the 
pump  must  be  fully  flushed  out  i.e.  returned  in  the  state  it  was 
provided. 
 
Numbers in parentheses (i.e. Cover (2)) following individual parts 
indicate reference numbers specified in SECTION 7 and 8. 
 
Steps before disassembly 

1. 

Obtain the appropriate Work Permit if required. 

2. 

Isolate power supply to motor 

– if fitted. 

3. 

Isolate  pump  from  liquids  in  inlet  and  discharge  lines, 
depressurise and purge out any toxic, flammable, corrosive 
or air hardening liquids (if present). 

Once the pump is removed from the pipework, flange O-rings and 
gaskets cannot be re-used. 
 
Short video tutorials are available on the Ebsray pumps website 
covering main maintenance tasks. 
 

Tools required for maintenance: 

  Metric Allen key set 

  Metric socket drive  

     Allen key set 

  Torque wrench 

  Small flat head screwdriver 

 

  Short  (100mm  long) 

piece  of  1-1/4  inch 
schedule 40 pipe  

  Soft head mallet 

  External circlip pliers 

  2 off M8x75 setscrews 

 

Before any re-assembly ensure all parts are deburred and cleaned. 
All O-rings MUST be replaced when any disassembly occurs. 

 

5.3 

SPARE PARTS 

When  ordering  spare  parts,  to  minimise  pump  downtime, 
ALWAYS  quote  the  pump  Serial  Number  located  on  the 
nameplate of the pump or SECTION 2.3 of this publication. 

NOTE: 

Substitute or so-

called ‘equivalent’ spare parts are not to 

be used. Safe operation and pump performance may be 

severely compromised if any substitute parts are used. 

The use of substitute parts may void the warranty. 

5.4 

INSPECTION UPON DISASSEMBLY 

1. 

Check Impeller  (3)  and  seal  zone  of  the  Bearing  Housing 
(20) for damage or wear.  Replace Impeller if blades have 
been  damaged  or  wear  exceeds  minimum  recommended 
dimensions: 

 

Minimum R75/R80 Impeller width is 21.70mm 

 

Minimum R77/R82 Impeller width is 24.70mm   

 

Minimum outside diameter is 155.75mm. 

 

2. 

Check  Shaft  for  wear,  damage  or  run-out.  Replace  as 
required.

 

3. 

Inspect  both  Bearings  for  wear.  It  is  recommended  during 
major overhauls that Bearings be replaced. Ball bearings are 
to be replaced after 50,000 operational hours.

 

 

4. 

Check Mechanical Seal components for wear or damage. It 
is  recommended  during  major  overhauls  that  Mechanical 
Seal components be replaced. 

Metric  
setscrew size 

Torque required  
in Nm (ft-lbs) 

M12 

100 (75) 

M10 

58 (43) 

M6 

13 (10) 

M5 

7 (5) 

Summary of Contents for R75

Page 1: ...damage Warns of hazards that WILL cause serious personal injury death or major property damage Warns of hazards that CAN cause serious personal injury death or major property damage Warns of hazards...

Page 2: ...formation pertaining to the pump is required this data must be furnished to an Ebsray representative Some pump models are listed by Underwriters Laboratories for LP Gas and or Anhydrous Ammonia servic...

Page 3: ...e incurred during transit should be noted on the packing note and on both your own and the carrier s copy of the consignment note Should a shortage be evident on receipt notify Ebsray immediately givi...

Page 4: ...ters provide straight alignment of the motor drive through a coupling connected to a straight key pump shaft 3 9 LONG COUPLED AND BELT DRIVES The R80 and R82 pumps are also designed to be long coupled...

Page 5: ...such conditions as excessive heating of ball bearings vibration or unusual noises NOTE Consult SECTION 9 of this manual if difficulties during start up are experienced and troubleshooting is required...

Page 6: ...ump must be fully flushed out i e returned in the state it was provided Numbers in parentheses i e Cover 2 following individual parts indicate reference numbers specified in SECTION 7 and 8 Steps befo...

Page 7: ...ing the piece of 1 1 4 inch pipe as a drift gently tap the Lip Seal into the Cartridge Ensure that the Lip Seal is flat flush by checking the holes in the back of the Cartridge 10 Fit the smallest new...

Page 8: ...ort the Impeller side of the DEB s inner raceway and press the driven end of the Shaft until the DEB is pushed off the Shaft 2 Then support the driven side of the IEB and press from the Impeller end o...

Page 9: ...eight bearing housing cap head setscrews and torque to 100 Nm 75 ft lbs 13 Aligning the Impeller keyway to the shaft key fit the Impeller to the shaft 14 Fit the Cover to Body note that the raised ca...

Page 10: ...Head Setscrew 8 101 Adaptor Flange Elbow 1 33 Dust Seal Bearing 1 101A Adaptor Flange Elbow Plug 1 34 Key Driver 1 102 Blanking Flange 1 40 Seal Seat 1 103 Valve Cover 1 41 Seal Face 1 103A O ring Val...

Page 11: ...Publication No 2753 20 11...

Page 12: ...1 20 Bearing Housing 1 99 Bearing Cap 1 21 Shaft 1 99A O ring Bearing Cap 1 23 Ball Bearing Inspection end 1 99B Cap Head Setscrews 8 24 Ball Bearing Drive end 1 100B Cap Head Setscrews 8 25 Circlip B...

Page 13: ...Publication No 2753 20 13...

Page 14: ...ture or Speed not as per design conditions Foreign matter jamming parts Pump out of alignment with driver Parts worn End of service life or adverse pumping conditions Excessive Noise Foreign matter ja...

Reviews: