P.71
[NOTE]
When parameter setting of the dip switches, other than dip switch-A
No.3 (BUZZER) and B-8 (Initializes the LCD screen), is performed,
the LCD controller counts down 10 seconds, the same as at the
power on state, right after the completion of the parameter setting.
[NOTE]
If any warning or alarm occurs during the parameter setting, the
setting session will be stopped automatically and the display will be
changed to the warning & alarm display screen.
The dip switch setting at the time of shipment from the factory are as follows.
Data length
: 8bits
Cooling water & N2 monitoring
:
Constant
BUZZER
:
USE
Operation switched to Remote
: According to signal
DILUTION N2 mode
: Standard
BP Operation in Remote
:
Automatic Operation
MP SPEED CONTROL
:
Not used
BP SPEED CONTROL
:
Not used
Remote IF
:
Not used
LCD screen initialize
:
Carry out initialize
Output the pump N2 warning
:
Normal Open
5.6 Starting/stopping the pump with the LCD controller
Maximum two LCD controllers can be connected. Note only one of them can start
and stop the pump (the other shows the pump operational statuses).
The controller of which LED “LOCAL” is lit on has precedence over the other to control
the start and stop operation.
If only one controller is connected, the controller starts and stops the pump.
One controller
connected
Two controller
connected
START/STOP
Allowed
The one with its LED
“LOCAL” lit on is
allowed.
When you use two LCD controllers, disconnect the one which you will not use for the
operation from the pump once. Then, attach it again.
PM10U
EBARA
CORPORATION
Summary of Contents for EV-S20
Page 10: ...viii LOCATION WARNING LABEL1 PM10U EBARA CORPORATION...
Page 11: ...ix LOCATION WARNING LABEL2 PM10U EBARA CORPORATION...
Page 16: ...xiv PM10U EBARA CORPORATION...
Page 33: ...P 14 3 5 3 Outline Drawing MODEL EV S20 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 34: ...P 15 MODEL EV S20P EV S 20N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 35: ...P 16 MODEL EV S50 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 36: ...P 17 MODEL EV S50P EV S50N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 37: ...P 18 MODEL EV S100 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 38: ...P 19 MODEL EV S100P EV S 100N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 39: ...P 20 MODEL EV S200 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 40: ...P 21 MODEL EV S200P EV S 200N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 41: ...P 22 MODEL EV S20 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 42: ...P 23 MODEL EV S20P EV S 20N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 43: ...P 24 MODEL EV S50 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 44: ...P 25 MODEL EV S50P EV S50N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 45: ...P 26 MODEL EV S100 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 46: ...P 27 MODEL EV S100P EV S 100N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 47: ...P 28 MODEL EV S200 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 48: ...P 29 MODEL EV S200P EV S 200N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 56: ...P 37 EV S20 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 57: ...P 38 EV S50 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 58: ...P 39 EV S100 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 59: ...P 40 EV S200 LOCATION FIXTURE PM10U EBARA CORPORATION...