
(
iii
)
Important Prior Warnings
DANGER
Keep out from under the pump when lifted.
Only qualified personnel shall unload and lift the pump.
WARNING
Be careful not to overturn the pump when pushing and pulling it
sideways, because the width of the pump is small to its height.
WARNING
All electrical works must be performed by only a qualified electrician.
All national and local electrical regulations must be observed.
WARNING
Circuit Breaker (CB) is not installed in the pump unit.
Please install Circuit Breaker (CB) based on the law and the standard
in the installation region.
WARNING
Interrupt Circuit Protector (CP) before starting on wiring
and maintenance work.
Do not switch on the power supply to the pump until work is completed.
WARNING
Supply N
2
gas to the exhaust piping when necessary to dilute
the inflammable or toxic gas up to a safe concentration.
WARNING
Purge with sufficient N
2
gas before removing and washing the
vacuum and exhaust piping.
Do not let inflammable, toxic or dangerous materials
disperse and guard against contact with the human body.
Always work in a location with an escape route in an emergency.
WARNING
Do not use the pump for another process without a previous
overhaul. Gases or reaction products remaining in the pump will
react and lead to accidents with the formation of large amounts of
products.
PM10U
EBARA
CORPORATION
Summary of Contents for EV-S20
Page 10: ...viii LOCATION WARNING LABEL1 PM10U EBARA CORPORATION...
Page 11: ...ix LOCATION WARNING LABEL2 PM10U EBARA CORPORATION...
Page 16: ...xiv PM10U EBARA CORPORATION...
Page 33: ...P 14 3 5 3 Outline Drawing MODEL EV S20 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 34: ...P 15 MODEL EV S20P EV S 20N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 35: ...P 16 MODEL EV S50 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 36: ...P 17 MODEL EV S50P EV S50N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 37: ...P 18 MODEL EV S100 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 38: ...P 19 MODEL EV S100P EV S 100N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 39: ...P 20 MODEL EV S200 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 40: ...P 21 MODEL EV S200P EV S 200N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 41: ...P 22 MODEL EV S20 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 42: ...P 23 MODEL EV S20P EV S 20N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 43: ...P 24 MODEL EV S50 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 44: ...P 25 MODEL EV S50P EV S50N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 45: ...P 26 MODEL EV S100 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 46: ...P 27 MODEL EV S100P EV S 100N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 47: ...P 28 MODEL EV S200 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 48: ...P 29 MODEL EV S200P EV S 200N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 56: ...P 37 EV S20 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 57: ...P 38 EV S50 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 58: ...P 39 EV S100 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 59: ...P 40 EV S200 LOCATION FIXTURE PM10U EBARA CORPORATION...