P.8
3.4.2 Cooling water
1. Close [facility] water supply to stop water supply to the pump, then close water
return valve. Follow [facility] procedures for locking these valves in the off
position.
2. Push the knurled outer ring of the quick-connect couplers toward the pump to
disconnect the water hoses. Carefully remove the male coupling valves
from the hoses and remake the quick-connects to drain the pump lines. Have
a catchment vessel and absorbent cloths at hand before removing the
couplings.
3. Make sure water outflow stops from both the facility lines and the pump.
3.4.3 Nitrogen (N
2
)
1. Close [facility] nitrogen supply valve and follow facility procedures for locking
this valve in the off position.
2. Verify that the nitrogen pressure gauge (on front panel of the pump) drops to 0
MPa, confirming that no pressurized gas energy is stored in the pump.
3. Pull out the red detent ring on the N
2
regulator.
4. Turn knob counterclockwise until pressure gauge reads 0 MPa. (Both N
2
regulator knob and nitrogen pressure gauge are located on front panel of the
pump.)
5. Disconnect tube connection of N
2
supply line by turning tube nut
counterclockwise.
6. Plug (cap) ¼” tube connector on the pump with a tube fitting cap.
3.4.4 Returning to Service
1. Unlock and open water and nitrogen valves.
2. Remove handle stop bracket and switch circuit breaker on.
3. Restrart pump and open foreline valve only after appropriate leak checks and
safety verifications.
PM10U
EBARA
CORPORATION
Summary of Contents for EV-S20
Page 10: ...viii LOCATION WARNING LABEL1 PM10U EBARA CORPORATION...
Page 11: ...ix LOCATION WARNING LABEL2 PM10U EBARA CORPORATION...
Page 16: ...xiv PM10U EBARA CORPORATION...
Page 33: ...P 14 3 5 3 Outline Drawing MODEL EV S20 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 34: ...P 15 MODEL EV S20P EV S 20N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 35: ...P 16 MODEL EV S50 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 36: ...P 17 MODEL EV S50P EV S50N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 37: ...P 18 MODEL EV S100 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 38: ...P 19 MODEL EV S100P EV S 100N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 39: ...P 20 MODEL EV S200 OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 40: ...P 21 MODEL EV S200P EV S 200N OUTLINE DRAWING PM10U EBARA CORPORATION...
Page 41: ...P 22 MODEL EV S20 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 42: ...P 23 MODEL EV S20P EV S 20N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 43: ...P 24 MODEL EV S50 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 44: ...P 25 MODEL EV S50P EV S50N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 45: ...P 26 MODEL EV S100 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 46: ...P 27 MODEL EV S100P EV S 100N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 47: ...P 28 MODEL EV S200 OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 48: ...P 29 MODEL EV S200P EV S 200N OUTLINE DRAWING OPTION PM10U EBARA CORPORATION...
Page 56: ...P 37 EV S20 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 57: ...P 38 EV S50 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 58: ...P 39 EV S100 LOCATION FIXTURE PM10U EBARA CORPORATION...
Page 59: ...P 40 EV S200 LOCATION FIXTURE PM10U EBARA CORPORATION...