EBARA DL Instruction Manual Download Page 9

 

 

EBARA 

CORPORATION

.

 

- 9 - 

 
 
 
 
 
 
 
 
 

Fig.3 

 
 
 
 
 

Note

 

Limit  the  continuous  operation  time  at  the  operable  minimum  water  level  to  10 
minutes.  Operation  longer  than  10  minutes  actuates  Auto-cut  in  the  motor  to 
stop the operation of the pump. 

 

9) 

Mounting a full-water alarm in the tank is recommended. The alarm panel and the float switch for 
water-level control are available from EBARA CORP. 

10)  When an electrode is used in the Automatic operation unit, care shall be paid not to entangle dirt 

around  the  electrode  rod  or  not  to  adhere  oil  to the  rod.  Those  phenomena  may  induce  error  in 
functioning. 

11)  Installation  of  an  attaching-

detaching  device  shall  conform  to  the  instruction  manual  “Quick 

Discharge Connector". 

 

 

 

 

 

 

 

 

 

 

12)  For  automatic  pumps  (DLA),  install  the  floats  as  shown  in  Fig.  4.    The  pump  may  not  start  if  a 

float switch touches the wall of the water tank or the piping.    Install the float so that this will not 
happen. 

13)  Models  DLA  and  DLJ  will  undergo  automatic  alternate  operation  only  when  they  are  paired.   

Position the floats for these automatic alternate operation pumps (DLJ) as shown in Fig. 5.    The 
pumps may not operate correctly if the floats are in the wrong position. 

 

 

 

 

 

 

 

 

 

 

Note 

Packing materials after installation, and wasted lubricant oil and grease, and parts after 

inspection and repair shall be transferred to a qualified waste-treatment contractor observing 

the applicable laws and the regional regulations.

 

Caution

 

Install  a  stand-by  pump  preparing  for  an  accidental  stop  of  the  operating  pump. 
There is a possibility of suspension of water supply to stop the facilities. 

 

Fig. 2 

Pipe 

support 

Sewage 

check valve 

Inlet 

Suspens

ion wire 

Attach the end of 

the wire near the 

manhole. 

Install this pipe joint near 

the manhole. 

Use a ground fault 

breaker 

Power 

supply 

 

Fig. 4 

 

Operating water level 

Stop water level 

The float must not be placed   
lower than this position. 

 

250(

0.

4k

W

,0

.75k

W

 

320(

0.

5k

W

3.

7k

W

Fig. 5 

 

Pump No. 1 

(DVJ type) 

Pump No. 2 

(DVA type) 

30 mm or more 

80 mm or more 

Summary of Contents for DL

Page 1: ...ion when protective device is activated 15 Installation 8 1 Confirmation before installation 8 Troubleshooting 17 2 Installation 8 Structure 18 3 Electric wiring 10 1 Sectional view 18 Operation 12 10...

Page 2: ...ontents shall be observed in any case Description of the indication Terms of warning Description Warning Wrong handling expects to raise a danger resulting in death or serious injury of the operator C...

Page 3: ...sassembling repairing and modifying the pump shall be limited to a repair technician There is a possibility of injury caused by electric shock ignition abnormal functioning trouble etc Before entering...

Page 4: ...nt or by leakage of enclosed liquid from mechanical seal Do not use the pump at an important facility computer cooling apparatus cooling apparatus for refrigerator etc Since machining oil rubber relea...

Page 5: ...the nameplate Specifically care shall be paid on the frequency 50 Hz or 60 Hz Caution Do not operate a pump of 50Hz at 60Hz The operation at wrong frequency induces pump break caused by excess pressur...

Page 6: ...clusion of foreign matter Do not use the pump at facilities for organisms fish farm fish preserve aquarium etc There is a possibility of extinction of organisms caused by leak current or by leakage of...

Page 7: ...side Ceramics carbon sliding material at motor side NBR rubber material Turbine oil ISO VG 32 Motor 1 2 Model number of poles Thermal class Phase frequency voltage current Built in protective device D...

Page 8: ...erval depending on the use environment Depending on the use environment there may be generated rust at threaded sections machined sections with rust proof coating rust proofing sections etc 1 On trans...

Page 9: ...his will not happen 13 Models DLA and DLJ will undergo automatic alternate operation only when they are paired Position the floats for these automatic alternate operation pumps DLJ as shown in Fig 5 T...

Page 10: ...needs to be provided in the final installation It is recommended to use a circuit breaker as main breaker that is suitable for isolation according to appropriate legal standard EN60947 2 and is equip...

Page 11: ...el E among the four lines as shown in Fig 7 Never connect the Green and Yellow stripe cord or the Green cord to the power source The grinding shall be surely conducted conforming to the Technology Sta...

Page 12: ...ition or at near the operable minimum water level the Auto cut in the motor is actuated If the situation is repeated the pump life becomes short Once the Auto cut is actuated the motor does not start...

Page 13: ...the pumps are now ready for operation Note Operate the pump at a discharge rate suitable for the facilities Operation at excessively small or large capacity causes noise and vibration and consumes unn...

Page 14: ...hin the limit of pump rating the pump may have caught foreign matter 2 If the discharge rate showed a sudden decrease foreign matter may have clogged the suction opening 2 Regular inspection 1 Once a...

Page 15: ...t every disassembly for inspection Every 20000 cycles of operation Every 100000 cycles of operation Expected replacement time One year or 6000 hours of total operating hours either of shorter one Once...

Page 16: ...and water to a container Then clean the inside the leakage detector s chamber and motor chamber and replace the mechanical seal as well as gaskets and O rings Leakage Detector Contact rating AC280V 0...

Page 17: ...ace the mechanical seal Liquid quality and operation conditions need to be reviewed Replace the mechanical seal Pumping not effected or insufficient pumping capacity Pump running in reverse rotation G...

Page 18: ...L SEAL 1 SET 811 SUBMERSIBLE CABLE 1 115 1 O RING 1 814 MOTOR FRAME 1 115 2 O RING 1 816 BRACKET 1 115 3 O RING 1 817 BRACKET 1 117 1 GASKET 1 830 SHAFT 1 117 2 SEAL WATER 1 849 1 BALL BEARING 1 120 1...

Page 19: ...without contacting with the suction cover Then enter the operation of the pump 11 Limited Warranty EBARA Corporation warrants to the original retail purchaser Customer the followings 1 This warranty v...

Page 20: ...uires about the pump please contact EBARA Singapore Ebara Engineering Singapore Pte Ltd Website www ebara com sg E mail ebaranet singnet com sg Malaysia Ebara Pumps Malaysia Sdn Bhd Website www ebara...

Reviews: