6
Eaton xStorage 400 Installation and Operation Manual P-164001032—Rev 01
•
Installation or servicing should be performed by qualified service personnel knowledgeable of battery
systems, and required precautions. Keep unauthorized personnel away from equipment. Consider all
warnings, cautions, and notes before installing or servicing equipment. DO NOT DISCONNECT the
batteries while the xStorage 400 is in service/online.
•
Keep the cabinet doors closed and front panels installed to ensure proper cooling airflow and to protect
personnel from dangerous voltages inside the unit.
•
Do not install or operate the system close to gas or electric heat sources.
•
Operating temperatures above the recommended range will result in decreased battery life and
performance, and will reduce or void the battery warranty. Refer to Terms and Conditions of Sale with
Battery Replacement Coverage and the Battery Replacement Price Book for more information. These
documents can be found at
www.eaton.com/powerquality
or contact your service representative for
information on how to obtain copies.
•
Observe all DANGER, CAUTION, and WARNING notices affixed to the inside and outside of the
equipment.
Summary of Contents for xStorage 400
Page 6: ...vi Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Table of Contents...
Page 8: ...viii Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 List of Figures...
Page 10: ...x Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 List of Tables...
Page 86: ...76 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Warranty...
Page 96: ...P 16400103201 P 164001032 01...