
22
InStallatIon anD oPeratIon manual
25-15049-G
October 2021 www.eaton.com
7. Installation
7.2 Wiring Details
7.2.1 PSU to Battery - Large Panel Variants
xDetect Large panel variants fitted with a single PSU require 2 x 12 V @ 12 Ah sealed
lead acid batteries to provide backup power in event of mains failure. Insert batteries
in panel
after
wall mounting. For information on adding an additional PSU,
see page 37
Insert the batteries as follows:
Figure 8 . Battery insertion order . Secure the batteries using
the provided battery straps
3
4
1
2