xChargeIn
Displays and operating elements
Operating instructions V1.04
111
© EATON
4
Displays and operating elements
4.1
LED bar
Fig. 4-5: Segments of the LED bar
The LED bar provides visual information about the current operating status
of the charging station. It consists of 4 segments (
S1
to
S4
), which can light
up or flash, together or individually, in various colors.
The LED bar is only visible with activated power supply.
Display
Description
Dark
No power supply or defect, for details see "Diagnosis"
Flashing green
(every 3 seconds)
Ready for operation
or with authorization option: Authorization done correctly
Flashing blue
(every 3 seconds)
The charging station is waiting for authorization to enable a
charging process.
Flashing green
(after plugging in)
Locking of the charging cable to the charging socket
Green
The plugged-in charging cable is locked and charging can be
started by the vehicle.
Flashing green
(every second)
Execution of a charging process (applies to “EN 61851 Mode 3“
charging process)
Flashing green
(every 3 seconds)
Charging complete and charging socket unlocked. The charging
cable can be unplugged.
Flashing orange
(every 5 seconds)
If the charging station is out of service, for example in the event
that the temperature is exceeded, the charging process is tem-
porarily interrupted and resumed after cooling down.
Blue and orange
The charging station is in start-up.
Orange
(5 seconds)
Self-test during start-up
Orange
(S2)
The charging station is in commissioning mode.
Flashing red
Error, for details see "Diagnosis"
Blue/red
Red/white
Error display via color code, for details on possible causes of er-
ror and troubleshooting see "FAQs" on our website
Summary of Contents for xChargeIn A Series
Page 2: ......
Page 4: ...xChargeIn 4 EATON...
Page 28: ...xChargeIn Instandhaltung Bedienungsanleitung V1 04 28 EATON...
Page 73: ...EATON xChargeIn V 1 04...
Page 76: ...xChargeIn V1 04 76 EATON 1 xChargeIn A Series X Series S Series M Series 1 1 ESD...
Page 77: ...xChargeIn V1 04 77 EATON 1 2 xChargeIn 1 3 1 4 1 5 Eaton...
Page 78: ...xChargeIn V1 04 78 EATON 1 6 1 6 1 1 6 2 1 7 www eaton com evc...
Page 79: ...xChargeIn V1 04 79 EATON 2 1 1...
Page 80: ...xChargeIn V1 04 80 EATON...
Page 81: ...xChargeIn V1 04 81 EATON 3 3 1 3 1 1 2a RFID 2b 3 LED 4a 4b 5 6...
Page 85: ...xChargeIn V1 04 85 EATON 4 4 1 LED 4 5 LED LED 4 S1 S4 LED 3 3 EN 61851 Mode 3 3 5 5 S2...
Page 86: ...xChargeIn V1 04 86 EATON 4 2 xChargeIn S Series M Series LED Dot Matrix 4 6 IP 4 2 1...
Page 87: ...xChargeIn V1 04 87 EATON 4 2 2 MID MID 1 MID 2 3 4 12 34 56 M MID vX X 1A2B...
Page 88: ...xChargeIn V1 04 88 EATON RFID...
Page 93: ...xChargeIn V1 04 93 EATON 6 6 1 LED 60 1 2 3 RFID 5 5 6 2 1 2...
Page 94: ...xChargeIn V1 04 94 EATON 3...
Page 95: ...xChargeIn V1 04 95 EATON 7 LED...
Page 96: ...xChargeIn V1 04 96 EATON LED...
Page 97: ...xChargeIn V1 04 97 EATON 8...
Page 98: ...xChargeIn V1 04 98 EATON...
Page 144: ...xChargeIn Mantenimiento Instrucciones de manejo V1 04 144 EATON...
Page 190: ...xChargeIn Maintenance Manuel d utilisation V1 04 190 EATON...
Page 304: ...xChargeIn Conserva o Manual de instru es V1 04 304 EATON...
Page 349: ......
Page 350: ...Eaton Industries Austria GmbH Eugenia 1 3943 Schrems Austria www eaton com evc...