13
Mounting and Operating Instructions Fire-Resistant Cabinet Type US-S ESF30
40071860245 (B) February 2020 www.ceag.de
6 Assembly/installation US-S ESF30 28-P und 13-P
6.12 Cable routing in the distribution cabinet
• Pre-drill the point where the cable is to be inserted accor-
ding to the cable diameter. Observe internal insulation,
mounting plates and fan!
• Insert existing cables through the cable bulkhead of the
housing.
After inserting the cables, please fill the existing gaps with
mineral wool.
Strip cables after feeding and route as shown in Figure 5.
Figure 5