UPS SYSTEM INSTALLATION
Eaton
Power Xpert 9395P-600 (380V-600V) UPS Installation and Operation Manual
S
P-164000710 Rev 1
www.eaton.com/powerquality
4-4
3.
Remove the three bolts securing the right-side shipping bracket to the cabinet
and three bolts securing the bracket to the pallet (see Figure 4‐2). Remove the
right-side shipping bracket.
Shipping Bracket
Bolts
Shipping Bracket
Bolts
Left Side
Shipping Bracket
Front Door
ISBM Removable
Front Panels
Pallet
Figure 4‐2. Removing the ISBM Section Right-Side Shipping Bracket
NOTE
This figure depicts the Shipping Bracket on the 380V, 400V, 415V, and 480V Two UPM configuration
pallet. The 600V sections are oriented the same way and the shipping brackets are removed the same way as
this illustration.
4.
Using a forklift (see the caution statement at the beginning of this procedure),
raise the cabinet until the cabinet bottom clears the pallet by approximately
3 mm (1/8
”
).
5.
Pull the pallet from under the cabinet. Discard or recycle the pallet and shipping
brackets in a responsible manner.
6.
Carefully lower the cabinet until the cabinet base contacts the floor.
7.
Repeat Steps 2 through 6 for the remaining cabinet.
8.