INSTALLATION
EATON
Powerware
®
9125 (9910-P30) UPS Installation Guide for IBM
®
Applications
S
164201636 Rev A
14
9.
Align each joining bracket with the adjacent corner screw holes and
secure with the supplied screws (see Figure 21).
Joining Bracket
EBM
UPS
Joining Bracket
Figure 21. Installing the Joining Brackets (Top View with Pedestals)
10.
If installing additional cabinets, repeat Step 9 for each cabinet and
continue to the following section, “EBM Installation;” otherwise,
continue to “PDM Installation” on page 17 or “Power Connections
and Startup” on page 20.
Summary of Contents for Powerware 9125
Page 8: ...This page intentionally left blank ...
Page 274: ...This page intentionally left blank ...
Page 275: ......
Page 276: ... 164201636A 164201636 A ...