INSTALLATION
EATON
Powerware
®
9125 (9910-P30) UPS Installation Guide for IBM
®
Applications
S
164201636 Rev A
16
3.
Plug the EBM cable into the UPS battery connector (see Figure 24).
4.
Attach the fixed cover plate (supplied in the EBM accessory kit) to
the EBM cable as shown in Figure 24.
EBM Cable
EBM Cable with
Fixed Cover Plate
Fixed Cover Plate
EBM Battery
Connector with
Cover
UPS Battery Connector
Figure 24. Typical EBM Installation
5.
If additional EBMs are to be installed, remove the EBM battery
connector cover. Remove the cover from the EBM cable of the
second cabinet and plug the EBM cable into the battery connector
on the first EBM. Attach the fixed cover plate to the EBM cable.
Repeat for each additional EBM. Up to four EBMs may be
connected to the UPS.
6.
Continue to the following section, “PDM Installation” or “Power
Connections and Startup” on page 20.
Summary of Contents for Powerware 9125
Page 8: ...This page intentionally left blank ...
Page 274: ...This page intentionally left blank ...
Page 275: ......
Page 276: ... 164201636A 164201636 A ...