INSTALLATION
EATON
Powerware
®
5125 (9910-E65) UPS Installation Guide for IBM
®
Applications
S
164201698 Rev 1
12
13.
For each optional EBM, loosen the wing nut on the rear hold-down
bracket and slide the EBM rear hold-down bracket into the slots on
the EBM rear panel.
Verify that the rear hold-down bracket is fully seated and then
tighten the wing nut.
Wing Nut on Rear
Hold-Down Bracket
(attached to rail)
Rear Hold-Down Bracket
(for EBM)
Figure 9. Securing the Back of the EBM
14.
Tighten the pan-head screws that secure both rails to the front of
the rack (see Step 3 on page 6).
15.
Continue to the following section, “Installing the Internal Batteries.”