INSTALLATION
EATON
Powerware
®
5125 (9910-E65) UPS Installation Guide for IBM
®
Applications
S
164201698 Rev 1
5
To install the rail kit(s):
NOTE
If installing EBM(s), install the EBM rails below the UPS rails.
1.
Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 1).
Rear
Front
Rail Assembly
Assembly Wing Nuts
Figure 1. Adjusting the Rail Depth
2.
Select the proper holes in the rail for positioning the UPS and any
optional cabinets in the rack.
Place the first rail at the bottom, using positions 1 and 6 for the
front pan-head screws. If you are installing additional rails, place the
next rail 4 holes above the last installed screw (see Figure 2).