Installation
Eaton
®
Power Xpert
®
9395C UPS Installation and Operation Manual P-164000821—Rev 01
www.eaton.com/powerquality
4-9
6.
Locate one flat bracket and screws from the hardware kit. Align the holes in the flat bracket over holes in
the front base of the ISBM and PM sections. Secure the bracket with the screws from the hardware kit
(see Figure 4-7).
7.
Proceed to paragraph 4.4.
Figure 4-7. ISBM Section to PM Section Joining Brackets
4.4
Electrically Connecting the Sections
1.
Unfasten the front door latch and swing the door open (see Figure 4-1).
2.
Remove the door. Remove the retaining screw located inside the door at the bottom hinge pivot point,
then lift the door off. Retain the hardware for later use.
3.
Remove the screws securing the ISBM section right bottom internal safety shield panel and remove the
panel to gain access to the internal input, output, and battery terminals. Retain the hardware for later use.
Front View Base Bracket
Power Cabinet Section Base
ISBM Section Base
Bracket from Kit
Screw from Kit
Screw from Kit
Top View Rear Bracket
Power Cabinet
Section Top
ISBM
Section Top
Screw from Kit
Screw from Kit
Bracket from Kit
Back
Top View Front Bracket
Power Cabinet
Section Top
Screw from Kit
Screw from Kit
ISBM
Section Top
Bracket from Kit
Front
NOTE
AC and DC input intercabinet power wiring harnesses are supplied coiled and
secured in the ISBM wireway on the right side of the ISBM section (see Figure 4-6).
Summary of Contents for Power Xpert Series
Page 2: ......
Page 23: ...Section I Installation...
Page 24: ......
Page 93: ...Section II Operation...
Page 94: ......
Page 155: ......
Page 156: ...P 164000821 1 P 164000821 1...