Reeppllaacciinngg aa FFaaiilleedd P
Paanneellbbooaarrdd C
CTT
Each panelboard sensor strip has (21) solid-core on-strip CTs and allows dynamic replacement of up to (3) of
these CTs with split-core CTs without powering down the monitored unit.
Figure 46. CT Fix Positions on Panelboard CT Strip
1
2
3
Replacement split-core CTs have the same monitoring accuracy as the on-strip solid-core CTs.
The following procedure to replace a failing panelboard CT is to be performed by Field Service personnel only.
Table 6. Replacing a Failed Panelboard CT – Procedure
Procedure Step
Illustration
1.
Identify the failing CT and panelboard CT strip.
2.
Log in to Infinity Monitoring System.
3.
Select the
Tools
button to bring up
Sensor Board
screen.
3
4
4.
Select the
Menu
button to display Menu Options.