IMPORTANT NOTES

1. This product  should be installed,  commissioned  and  

maintained  by or under the supervision of a competent   
electrician in accordance w ith current electrical engineering   
Codes of Practice, Regulations  for the Electrical  equipment   
of Buildings  (BS7671),  CDM2007  - Construction  (Design  
and Management)  Regulations  2007, HSG150  - Health  and  
Safety in Construction,  Statutory requirements  and any  
Specific instruction issued by the Company.

2. After completing  the installation  and testing of this product it  

is essential that this leaflet is draw n to the attention of the  
person responsible for its future operation  and maintenance,   
and is at all times available for ready reference.

3. These notes assume throughout that the product is 

disconnected from the supply. It is essential that this is done 
before any w ork is carried out.

4. When carrying out insulation  resistance testing, ensure the          

meter voltage fuses are removed.

MEMSHIELD 3 SMARTMETER SPLIT LOAD DISTRIBUTION BOARD

Instruction leaflet LT1184 (03/21)

Drawn asEBMSL642MPMB

kWh

W

Meter operating instructions can  
be found on leaflet provided with  
digital meter.
Please ensure that meter  
instructions are available for  
continued use of the product.

METER

LOAD 2

LOAD 1

These Distribution Boards are designed only for
use w ith

MCB’s and RCBO’s as listed in the current

Mem shield 3 catalogue.
Failure to com plyw illresult in invalid w arranty and
certification.

CAUTION
Do not fit SP & SN, or 4 pole MCB’s in TP   
type B board

Ensure both neutral  

shields are fitted 
after  installation

Tighten to  

15Nm

Earth bolt 

Tighten to 

15Nm