5. Cable installation 

Note: Surge filters require special treatment regarding installation practices, if optimal protection with 
safety is desired. Internal cabling should follow the rules below: 

Note for TN models only: 

 

The TN models use the supply neutral as the main surge return path. For this reason, it should 
not be under-sized and should be the same size as, or larger than the phase conductor size. 
Composite cables usually use under-sized neutral conductors and are unsuitable for primary 
connections to SPDs. 

Notes for TT models only: 

 

The TT models use a separate “Surge Return earth”, as well as the normal safety earth. The 
purpose of the “Surge Return Earth” is to provide a separate earth path for surges, preventing 
their conduction into other equipment. 

 

The “Surge Return Earth” should be sized the same as the phase conductors, or larger.  

 

The “Surge Return Earth” should be connected to the earth block in the supply SWB i.e. at the 
same point as the normal safety earth.  

 

If remote from the SWB, a local ground rod or system should be employed and connected to the 
“Surge Return Earth” only. In this case, the normal safety earthing conductor should still be 
connected at the supply point. 

Ensure that the correct wiring diagram is followed for each model. Refer to the diagrams on the preceding 
pages: 

 

Single-phase TN model – Figure 1a 

 

Single-phase TT model – Figure 1b 

 

3-phase TN model – Figure 2 

 

3-phase TT model – Figure 3 

If you have any questions, please contact Eaton or your distributor prior to commencing work. 

F

 

Open door.   

F

 

Carefully unplug the door earth cable from lug on door. 

F

 

Remove door.   

F

 

Attach the supplied cable glands to the enclosure. Tighten using appropriate tools. 

F

 

Determine the cable length necessary for installation and, leaving an extra 100mm, cut off any 
surplus cable.  

F

 

Feed the cable(s) through the gland to the required depth and tighten gland. 

To prevent slippage during termination, place a strong cable tie around the cable, immediately 
above and below the cable gland. Remember to remove before commissioning. 

F

 

Strip the cable sheath and form the individual wires roughly into position. 

F

 

With reference to the wire lugs to be applied to the cable, cut each cable to the correct length. 

F

 

In the case of an armoured/shielded input cable, cut the armour/shield back and use a clamp.  

If using armoured/shielded cable with an earth clamp, provide a suitable length of 16-25mm

2

 cable 

to link the earth clamp with the geartray earth stud. Keep length as short as possible (<300mm). 
Earth stud torque is 10Nm. 

 

Summary of Contents for ESF Series

Page 1: ...t or require clarification of any issue please contact your local Eaton distributor or office PREPARATION FOR INSTALLATION Prior to installation please read the following application statement then fo...

Page 2: ...Mounting location for geartray models is more than 150mm from any surface to the sides top and bottom with adequate clearance at the front for installation with the cable cover in place F Mounting lo...

Page 3: ...Input and output cables must be kept well apart Minimum distance is 300mm F IF INSTALLED IN A SWITCHBOARD THE LOAD EARTH IS TO BE DIRECTLY CONNECTED TO MAIN SYSTEM EARTH NOT THIS UNIT F Ensure that y...

Page 4: ...ect may be required prior to commissioning or the actual commissioning may be carried out or witnessed by an energy authority representative For these reasons ensure that the enclosed instructions are...

Page 5: ...ed with unit For safety one anchor should be capable of supporting this weight alone F Attach the mounting brackets using the short M8 fasteners supplied F Using a suitable lifting device or a team of...

Page 6: ...INSTALLATION SPECIFICATION Eaton Industries Pty Ltd August 2010 10 Kent Road Mascot NSW 2020 Australia Page 6 of 13 DOCUMENT 510091...

Page 7: ...INSTALLATION SPECIFICATION Eaton Industries Pty Ltd August 2010 10 Kent Road Mascot NSW 2020 Australia Page 7 of 13 DOCUMENT 510091...

Page 8: ...INSTALLATION SPECIFICATION Eaton Industries Pty Ltd August 2010 10 Kent Road Mascot NSW 2020 Australia Page 8 of 13 DOCUMENT 510091...

Page 9: ...this case the normal safety earthing conductor should still be connected at the supply point Ensure that the correct wiring diagram is followed for each model Refer to the diagrams on the preceding pa...

Page 10: ...ing is required fit the 16mm cable gland removing the blanking plug first F Connect alarm cable must be double insulated through the 16mm cable gland F Using self adhesive cable tie holders secure ala...

Page 11: ...the master switch if applicable Power should now be applied to the unit F After a short period 5 seconds there should be a blue indicator visible through the window on the door panel Be aware of any...

Page 12: ...e would like to hear from you if you have any suggestions or complaints regarding our products Please contact your supplier to discuss the matter Finalised by Date Warranty Eaton Industries warrants t...

Page 13: ...______________________________________________________________________ ______________________________________________________________________ _________________________________________________________...

Reviews: