INSTALLATION SPECIFICATION
Eaton Industries Pty Ltd
August 2010
10 Kent Road, Mascot, NSW 2020, Australia
Page
4
of
13
DOCUMENT# 510091
If the preceding checklist is completed satisfactorily, you may proceed with installation. Read the following
pages carefully before commencing. If you aren't sure about anything, or have any questions, please
contact Eaton or your distributor prior to commencing work.
2. INSTALLATION
Proceed with installation as follows. The basic order of operations is:
•
Safety
isolation
•
Fit unit to mounting surface
•
Cable
installation
•
Pre-commission
tests
•
Commissioning
•
Handover
These operations may be carried out by different groups of people, therefore it is important to complete
each operation and sign-off before proceeding to the next stage. In particular, an ‘approval to connect’
may be required prior to commissioning or the actual commissioning may be carried out or witnessed by
an energy authority representative. For these reasons, ensure that the enclosed instructions are followed
correctly and that each section is signed-off.
3. Safety Isolation
Prior to commencing installation of the unit, testing must be performed to ensure that the site is
electrically safe. In the absence of a suitable procedure, follow the steps below.
Perform all steps even
if the site is not yet connected to power.
F
Ensure that supply is isolated. Trace supply cables to their connection points and tag-off relevant
supply breakers/fuses to prevent accidental connection using suitable ‘Danger’ tags.
F
Ensure that load is isolated. Tag-off relevant load breakers/fuses to prevent accidental connection
using suitable ‘Danger’ tags.
F
Ensure that the supply neutral is temporarily isolated. Tag as necessary.
F
Test all cables against site earth to ensure no voltages are present.
Completed by:
Date: