Enterprise Power Solutions Installation and Operation Guide
50
Copyright © 2008 Eaton Corporation. All Rights Reserved.
IPN 997-00012-56C September 2008
Step 4 - Replace circuit breaker cover
Step 5 - Connect load or battery module (if required)
1
Switch the circuit breaker to the OFF (O) position.
2
Connect the load equipment or battery (if required):
•
For a load circuit breaker, connect the cables to the load equipment
(see details on page
), or
•
For a battery circuit breaker, plug in the battery module cable (see
details on page
).
Step 6 - Switch on circuit breaker
•
For a load circuit breaker:
•
Switch the load circuit breaker to the ON (I) position.
•
Follow the equipment suppliers instructions for starting the
equipment.
•
Check the
Load Fuse Fail
alarm clears.
Only load circuit breakers with equipment connected must be switched
ON (I) to clear the alarm.
•
For a battery circuit breaker:
•
Switch the battery circuit breaker to the ON (I) position.
•
Check the
Battery Fuse Fail
alarm clears.
All battery circuit breakers (including any unused circuit breakers)
must be switched ON (I) to clear the alarm.
•
The battery module(s) will begin to charge.
The batteries will charge to 90% capacity in approximately 3 hours.
However, it is recommended that they are charged for 24 hours after
long-term storage.
Procedure complete