background image

3

Mounting and Operating Instructions Fire-Resistant Cabinet Type DualGuard-S ESF30   October 2022   www.eaton.com

1  Important information

1  Important information

1.1 General

Mounting work must always be performed by qualified 

electricians (also refer to DIN VDE 0105 Part 1, the German 

Accident Prevention Regulations in BGV A3 issued by the 

Association of Commercial and Industrial Workers' Com-

pensation Insurance Carriers [Berufsgenossenschaft] or 

equivalent regulations and guidelines of the country where 

the equipment is installed and operated). Other persons 

are only authorised to perform the work described in these 

instructions when
•   they have received appropriate subject matter and tech-

nical instructions,

•   their tasks and activities have been precisely defined and 

understood,

•   the activities are carried out under the supervision of 

specialists and experts.

Please observe:

•   the accident prevention guidelines and workplace directive,

•   the instructions issued by the technical regulatory agency,

•   DIN4102 to assess fire safety and structural/technical 

aspects,

•   the technical specifications in our catalogue or datasheet,

•   the proper condition of the products.

•   Comply with the general building law and the building 

requirements.

•   Comply with the corresponding standards to evaluate fire 

protection and building aspects

•  Screw connections for the framework may only be made 

using approved, suitable screws/dowels.

•  The suitability of the screws/dowels must be checked for 

the specific framework.

If the cabinet has not yet been bolted to the building struc-

ture, the stability of the equipment is compromised when 

the door is open. 
The doors must be kept closed when the equipment is in 

operation.
Improper installation can compromise the safety functions.
Only approved and appropriate screws/dowels must be 

used as fasteners to the building structure. The suitability 

of screws/dowels must be determined specifically for each 

building.
The enclosures must not be painted or coated otherwise; 

stickers are prohibited. The enclosure body must not be 

damaged (drilling holes, screws). The locking systems must 

not be modified or replaced.
When working with these mounting and installation instruc-

tions, the following instructions highlighted with an attention 

symbol and a keyword must be specifically observed.

1.2 Key to symbols

Important technical safety information in these operating 

instructions is designated by symbols.

 NOTE:

Provides important tips and pointers on procedures, or for 

handling the described equipment or plant components.

 ATTENTION!

Calls attention to hazards that can cause damage to equip-

ment or plant components, or can result in environmental 

damage.

 WARNING!

Calls attention to hazards that can result in bodily injuries or 

cause serious damage to equipment or plant components, 

or can result in serious environmental damage.

 DANGER!

Calls attention to hazards that can cause life threatening 

injuries or serious damage that represents a direct danger 

for people or the environment.

 WARNING!

The figures in these mounting and installation instructions 

are partly for the purpose of illustrating the descriptions.
Any time
•  exact measurements or

•   accurately modified drawings to reflect local conditions 

are required, any drawings specifically prepared for the 

installation must be bindingly observed.

 WARNING!

Only perform work for which you have sufficient trade qual-

ifications, and for which you have been briefed on the local 

operating conditions.
Whenever enhancements, modifications, maintenance, or 

work not described in this manual are required, these must 

be performed by specifically trained specialists and service 

personnel (either from CEAG as the manufacturer or sales 

and service companies authorised by CEAG)!

1.3 Information for the mounting and installa-

tion instructions

Please store these mounting and installation instructions in 

a safe place - they are an integral component of the supplied 

mains distribution cabinet. Safe and approved function can 

only be assured if this manual is adhered to.

1.4 Applicable documents

The mounting and installation instructions for the central 

battery systems DualGuard-S must be observed in addition 

to the mounting and installation instructions.

Summary of Contents for DualGuard-S ESF30

Page 1: ...rating Instructions Fire Resistant Cabinet Type DualGuard S ESF30 Mounting and Operating Instructions Fire Resistant Cabinet Type DualGuard S ESF30 Target group qualified electricians according to DIN...

Page 2: ...SF30 SOU3 8 4 5 DualGuard S ESF30 SOU2 9 4 5 1 Components DualGuard S ESF30 SOU2 9 4 5 2 Dimensioned drawings DualGuard S ESF30 SOU2 9 4 6 DualGuard S ESF30 SOU1 9 4 6 1 Components DualGuard S ESF30 S...

Page 3: ...ibited The enclosure body must not be damaged drilling holes screws The locking systems must not be modified or replaced When working with these mounting and installation instruc tions the following i...

Page 4: ...malfunc tions or a complete failure of the equipment In the event of the use of unauthorised replacement parts all the guarantee service compensation and liability claims become null and void 1 8 Disp...

Page 5: ...These personnel must have been trained in possible hazards that may occur A qualified person is anyone who based on his her training expertise and experience as well as his her knowledge of the relev...

Page 6: ...ternal temperature 3 Thermostatic control of external temperature 4 3 PM IO module 5 Thermostatic control temperature exceeded 6 Control module ACU 7 PSU 8 Circuit switch overs SKU 1 CG S 2 4 3 5 8 8...

Page 7: ...k 2 Thermostatic control of internal temperaturer 3 3 PM IO module 4 Thermostatic control temperature exceeded 5 Control module ACU 6 PSU 7 Circuit switch overs SKU 1 CG S 449 1198 898 449 1198 898 7...

Page 8: ...ualGuard S ESF30 SOU5 4 4 DualGuard S ESF30 SOU3 4 4 1 Components DualGuard S ESF30 SOU3 230 396 1135 4 3 2 Dimensioned drawings DualGuard S ESF30 SOU5 230 396 1135 230 396 1135 396 230 835 4 4 2 Dime...

Page 9: ...DualGuard S ESF30 SOU2 396 230 685 4 5 2 Dimensioned drawings DualGuard S ESF30 SOU2 396 230 685 396 230 685 1 Enclosure 2 Circuit modules SOU CG S 2 x 4 A 1 2 4 6 DualGuard S ESF30 SOU1 4 6 1 Compon...

Page 10: ...ion enclosure is not immediately used or installed it needs to be stored in an appropriate location Ensure that spray water cannot form or penetrate do not store outdoors Fire protection enclosures ha...

Page 11: ...rforated masonry blocks and the different materials such as clay brick lime sandstone or normal lightweight or cellular The wall plugs supplied by us are suitable for DIN masonry and blocks In case of...

Page 12: ...tem via enclosure rear wall EH Attachment locations to mount the optional mounting system or for direct installation 6 10 Delivered scope Our products are shipped complete with everything nee ded and...

Page 13: ...e fill the existing gaps with mineral wool After inserting the cables set them down and lay them as shown in the picture below 6 13 Pedestal installation Install the pedestal of the ES enclosure in a...

Page 14: ...and property damage 2 Disconnect and remove the temperature sensor Loosen the cable connection at the contacts of the termi nal block Pull out the temperature sensor with cable out of the enclosure 3...

Page 15: ...n com 8 Ventilation diagram 8 Ventilation diagram ATTENTION The black compriband is part of the ventilation system and ensures among other things that only the fresh supply air comes from below at the...

Page 16: ...10 30 V DC Surveillance current 95 uA Current for alarm 6 30 mA average lifetime 10 years Protection IP32 Operating temperature 30 55 C Compliance with the standard EN 54 7 Before starting up the fun...

Page 17: ...age WARNING 230V AC Dangerous Voltage May cause death heavy body injuries and property damage Disconnect all poles of the device before starting to dismantle or changing the composition Follow the ins...

Page 18: ...ly sealed 9 Setup and installation DualGuard S ESF30 SOU5 SOU3 SOU2 SOU1 9 1 Wall mounted installation Only the dowels or anchor screws described in the General construction code approval must be used...

Page 19: ...19 Mounting and Operating Instructions Fire Resistant Cabinet Type DualGuard S ESF30 October 2022 www eaton com Notes Notes...

Page 20: ...ays to find the right solution for every application Our stakeholders therefore expect more than just innovative products Companies turn to Eaton because they know that individual support and the succ...

Reviews: