The transformer should be located on a concrete pad of 

sufficient strength to support the weight of the unit. The 

pad must be level. The location of the transformer, whether 

indoor or outdoor, should provide for adequate accessibility, 

ventilation and ease of inspection. The transformer should 

be at least 24 inches from any obstruction. These are 

the recommendations of the manufacturer for operation 

purposes; see your local codes for additional guidelines. 

Location in areas of corrosive chemicals should be avoided.
These substation transformers are built to operate at 

altitudes up to 3300 feet at 30°C average and 40°C 

maximum ambient, unless otherwise specified. Before 

operating a standard transformer at higher altitudes, contact 

your factory representative.
Adequate ventilation must be provided. For indoor 

installations, room air inlets should be located at floor level; 

the air outlets should be located as high as the room will 

permit. The number and size of the air inlets depends upon 

the rating of the transformer. In general, about 20 square 

feet each of inlet and outlet area should be provided for 

each 1000 kVA of transformer capacity. If the ventilation 

system is adjustable, it should be locked permanently open 

to avoid overheating of the transformer in case of operator 

error. 

Connections

Connections must be made without placing undue stress 

on the bushing terminals. Conductors should be securely 

fastened in place and supported properly, with allowance 

for expansion and contraction. Make sure that the tap 

connection is proper for the required voltage. Changes in 

tap connections must be done ONLY with the transformer 

high voltage and low voltage circuits completely  

"DE-ENERGIZED". Safely verify that there is no voltage 

present at the terminals.

 

WARNING 

Do not change connections on a transformer that is 

energized . Ground all circuits before making any trans-

former connection . Failure to observe precautions when 

making connections can result in exposure to high volt-

ages, which can cause death, severe personal injury or 

damage to the equipment .

 

WARNING 

Do not make any connections, except as authorized  by 

the nameplate or  schematic . Improper connections 

can result in severe personal injury and damage to the 

equipment .

Transformers equipped with an internal terminal board are 

normally shipped with the higher voltage connected, unless 

otherwise specified by the customer.
A secure and effective low resistance ground is essential 

for protection. The transformer must be grounded perma-

nently by connecting a heavy ground cable to the ground 

pad located at the bottom of the tank. If the transformer is 

designed for operation in a solidly grounded neutral system, 

the neutral connection should be solidly and permanently 

grounded with minimum resistance.

WARNING 

Improper grounding may result in personal injury or 

damage to the equipment . 

Lightning arresters are recommended for every trans-former 

installation. Arresters of proper rating should be located as 

close as possible to the transformer terminations.
When alarm contacts or controls are supplied with the 

transformer accessories, a connection box may be provided 

to facilitate termination of the customer's cable or conduit.

Final inspection

The final inspection can be done in three major steps: 

Electrical, Internal and External. 

WARNING 

Do not tamper with interlocks, alarm or control circuits .  

Doing so can produce unsafe conditions for operators or 

result in damage to the equipment .

Electrical inspection should determine that:
1.  All external connections have been made properly 

(phasing of connections to terminal bushings, etc.).

2.  All connections are tight and secure.
3.  All accessory contact circuits are operational.
4.  Current transformer circuits, if supplied, have secondar-

ies either shorted or connected through their load.

5.  Tap changer is operative and properly positioned.
6.  The correct transformer ratio exists for units furnished 

with internal terminal board.

7.  There is no grounding of windings that are not 

intended to be grounded. A 1000-volt megger test is 

recommended.

8.  There is continuity in all windings.
9.  The dielectric strength of the insulating liquid is  

30 kV minimum when new. (Refer to section for 

"Testing Insulating Liquid" in this manual.)

10.  The neutral and ground connections have been properly 

made. 

2

SubStation tranSformer inStallation and partS replacement information

   MN202002EN   JUNE 2016

Summary of Contents for COOPER POWER SERIES

Page 1: ...transformer installation operation and maintenance instructions and parts replacement information COOPER POWER SERIES Effective June 2016 Supersedes S210 15 10 February 2013 Substation Transformers M...

Page 2: ...ISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES In no even...

Page 3: ...ling fans 6 High voltage bushings 7 Low voltage bushings 7 De energized tap changer 8 Insulating liquid 8 Vacuum fault interrupter VFI 9 Maintenance 11 Periodic inspection 11 Removing and replacing bu...

Page 4: ...information DANGER Hazardous voltage Contact with hazardous voltage will cause death or severe personal injury Follow all locally approved safety procedures when working around high and low voltage l...

Page 5: ...ection to detect any signs of damage or mishandling Locate any accessory parts that may have been shipped separately 3 If any damage is detected or shortages are noticed write a brief description on t...

Page 6: ...t make any connections except as authorized by the nameplate or schematic Improper connections can result in severe personal injury and damage to the equipment Transformers equipped with an internal t...

Page 7: ...which could lead to failure of the transformer caution Before breaking the seal of any handhole manhole or bushing hole bleed internal pressure to zero Seals should not be broken in the presence of f...

Page 8: ...indicate the top liquid temperature in the tank in degrees Centigrade The temperature sensitive element is mounted in a leak proof well permitting removal of the thermometer without lower ing the oil...

Page 9: ...and contact ratings refer to the schematic furnished with the transformer When required the pressure gauge is furnished with a pressure regulator that will automatically regulate the tank pressure be...

Page 10: ...mer windings All contacts are factory set to operate at the temperatures shown in the connection diagram If readjustment of the contacts is desired consult the factory for detailed instruction Transfo...

Page 11: ...is through the manhole When reinstalling the bushing install a new gasket in the gasket recess on the underside of the flange to insure that the gasket is properly seated in the groove A flat washer...

Page 12: ...late Insulating liquid The insulating liquid in substation transformers is either conventional transformer oil R Temp fluid or Envirotemp FR3 fluid When makeup liquid is required use only approved flu...

Page 13: ...equipment Do not operate loadbreak equipment if a fault condition is suspected Doing so can cause an explosion or fire Use a hotstick to operate transformer loadbreak equipment After operating transfo...

Page 14: ...iated Refer to Service Information S285 75 1 Tri Phase TPG and TPG with SCADA Electronic Control Installation and Operation Instructions for electronic control operation instructions Standard electric...

Page 15: ...working with bushings make sure that the transformer is de energized and that all circuits to and from the transformer are grounded in order to discharge any stored energy and prevent accidental re e...

Page 16: ...hing for removal 5 Remove the bushing Replacing Replacement bushings can be installed by following the removal procedure in reverse order Clamp bolts should be tightened as specified in Table 1 The ga...

Page 17: ...ctions from the tank flange noting the location and orientation up down of each piece To reinstall the bolt on main tank cover 1 Return the gasket sections to their original positions and orientation...

Page 18: ...R3 fluid can be filtered by means of a filter press The filter press is effective for removing all types of foreign matter including finely divided carbon and small amounts of moisture The purifier eq...

Page 19: ...at lower temperatures If the transformer cover or manhole must be removed for internal service exposure time to ambient air should be minimal Avoid exposure times greater than 24 hours Immediately aft...

Page 20: ...hould be reported and investigated Annual Cabinet Interior Maintenance Items to Inspect Points to be checked Remedial Action Frequency Gauges and Controls Check for proper operation Repair or replace...

Page 21: ...in plating will achieve a rainbow coloring if a particular terminal is experiencing an over temperature condition Tighten any loose connections immediately Any damage or discoloration that is observed...

Page 22: ...This page is intentionally left blank 18 Substation transformer installation and parts replacement information MN202002EN JUNE 2016...

Page 23: ...This page is intentionally left blank 19 Substation transformer installation and parts replacement information MN202002EN JUNE 2016...

Page 24: ...call 1 877 277 4636 or visit www eaton com cooperpowerseries SAFETY FOR LIFE Eaton 1000 Eaton Boulevard Cleveland OH 44122 United States Eaton com Eaton s Power Systems Division 2300 Badger Drive Wau...

Reviews: